Pages that link to "ML20117E782"
Jump to navigation
Jump to search
The following pages link to ML20117E782:
Displayed 26 items.
- PY-CEI-NRR-0684, Application for Amend to License NPF-58,changing Tech Spec Section 4.8.1.2.e.1 to Agree W/Rev 2 of App II of Tdi Diesel Generators Owners Group Design,Review & Quality Revalidation Rept.Fee Paid (← links)
- PY-CEI-NRR-0712, Application for Amend to License NPF-58,consisting of Tech Spec Change Request Re MSIV Leakage Control Sys,Per NUREG-1169.Fee Paid (← links)
- PY-CEI-NRR-0720, Application for Amend to License NPF-58,changing Tech Specs 3.0.4,4.0.3 & 4.0.4 & Bases for Tech Specs 3.0 & 4.0,per Guidance Provided by Generic Ltr 87-09.Fee Paid (← links)
- PY-CEI-NRR-2430, Application for Amend to License NPF-58,revising Allowables Values for CST Low Water Level Limits from Greater than or Equal to 59,700 Gallons to Greater than or Equal to 90,300 Gallons (← links)
- PY-CEI-NRR-2406, Application for Amend to License NPF-58,eliminating Requirement in EPP to Sample Lake Erie Sediment in Perry & Eastlake Plant Area for Corbicula.Summary & Description of Change Is Encl (← links)
- PY-CEI-NRR-0643, Application for Amend to License NPF-58,requesting one-time Exception to Tech Spec 4.6.1.2.f Be Granted to Extend Testing Interval of MSIVs in Steam Line a Until 870712. Application Fee Will Be Submitted Under Separate Cover (← links)
- PY-CEI-NRR-0534, Application for Amend to License NPF-45,changing Low Pressure Alarm Setpoint in Surveillance Requirement 4.5.1.e.2.c to Greater than or Equal to 155 Psig.Requests Amend Be Processed as Emergency (← links)
- PY-CEI-NRR-0592, Application to Amend License NPF-58,revising Tech Spec Table 3.6.4-1 to Change Max Isolation Time of RCIC Sys Inboard Containment Isolation Valve 1E51-F063 to 20 S.Fee Paid (← links)
- PY-CEI-NRR-0595, Application for Amend to License NPF-58,adding Footnote to Tech Spec 3.7.3 to Modify Applicable Conditions During Which RCIC Sys Required to Operate.Fee Paid (← links)
- PY-CEI-NRR-2207, Application for Amend to License NPF-58,revising TS 5.2.2.e, Organization-Unit Staff, by Removing Ref to NRC Policy Statement on Working Hours (← links)
- PY-CEI-NRR-2359, Suppl Application for Amend to License NPF-58,involving Rev of Main Steam Line Leakage Requirements & Elimination of Main Steam Isolation Valve Leakage Control Sys.Proprietary Calculations Encl.Proprietary Encls Withheld (← links)
- PY-CEI-NRR-2245, Application for Amend to License NPF-58,revising TS 3.8.1, AC Sources - Operating, to Be Consistent W/Recommendations in GL 94-01, Removal of Accelerated Testing & Special Reporting Requirements for Edgs (← links)
- PY-CEI-NRR-0765, Application for Amend to License NPF-58,changing Tech Specs Section 3.3.2,Table 3.3.2-2 to Provide Final Values for Rhr/Rcic Steam Line Flow High Trip Setpoint & Allowable Value Based on Results of Startup Testing Program (← links)
- PY-CEI-NRR-0778, Application for Amend to License NPF-58,revising Wording of Tech Spec 4.8.1.1.3 to Allow Reporting to Be on Per Diesel Generator Basis & Table 4.8.1.1.2-1 Clarifying Number of Failures Determined & Reduction of Test Frequency.Fee Pai (← links)
- PY-CEI-NRR-0817, Application for Amend to License NPF-58,revising First Stage Turbine Pressure Setpoints Based on Test Data in Tech Spec Tables 3.3.1-1,note (H) & 3.3.4.2-1,note (B) & Sections 2.2.1.10 & 2.2.1.11.Fee Paid (← links)
- PY-CEI-NRR-2298, Application for Amend to License NPF-58,increasing Present Div 3 DG Fuel Oil Level Requirements to Account for Rounding Error in Calculation & Unusable Vol Due to Vortex Formation at Eductor Suction Nozzles Located in Fuel Oil Storag (← links)
- PY-CEI-NRR-0823, Application for Amend to License NPF-58,revising Tech Specs Administrative Controls Section,Clarifying Wording in Sections 1.0 & 6.8.4.a,correcting Typos in Sections 4.7.7.1 & 4.8.1.1.2.e.2 & Deleting Footnotes.Fee Paid (← links)
- PY-CEI-NRR-2165, Application for Amend to License NPF-58,revising Tech Specs Surveillance Requirement for MSIV Leakage Rate Acceptance Criteria (← links)
- PY-CEI-NRR-2104, Application for Amend to License NPF-58,modifying MCPR Reactor Core Safety Limit Contained in TS 2.1.1.2 (← links)
- PY-CEI-NRR-2076, Rev 2 to Nonproprietary Version of Controlled Copy of Dose Calculation Data Base for Application of Revised DBA Source Term to CEI Pnpp (← links)
- PY-CEI-NRR-1537, Application for Amend to License NPF-58,revising Tech Spec 3.6.3.4, Suppression Pool Makeup Sys, Providing Water from Upper Containment Pool to Suppression Pool by Gravity Flow Through Two 100% Capacity Dump Lines Following LOCA (← links)
- PY-CEI-NRR-1425, Application for Amend to License NPF-58,changing TS 3.3.7.4-1 Re Remote Shutdown Sys Controls to Remove Line Item for Controls to RCIC Pump Discharge to Lube Oil Cooler Valve (← links)
- PY-CEI-NRR-1961, Application for Amends to Licenses NPF-58,reflecting One Time Extension of Performance Intervals for Certain TS Surveillance Requirements (← links)
- PY-CEI-NRR-1956, Application for Amend to License NPF-58,proposing Early Implementation of Control Rod Drive Scram Time Testing Consistent W/Requirements in Pnpp Improved TS LAR (← links)
- PY-CEI-NRR-1284, Application for Amend to License NPF-58,changing Tech Specs 3/4.3.1 Re Reactor Protection Sys instrumentation,3/4.3.6 Re Control Rod Block Instrumentation & 3/4.3.7.6 Re Source Range Monitors (← links)
- ML23263A639 (← links)