Pages that link to "Leazar D"
← Leazar D
Jump to navigation
Jump to search
The following pages link to Leazar D:
Displayed 29 items.
- NOC-AE-0017, Forwards Results of Control Rod Testing in Response to NRC Bulletin 96-001, Control Rod Insertion Problems. Encl Consists of Core Map,Current Unit 1 Specific Core Design Data & Units 1 & 2 Restart Evaluation Criteria (← links)
- NOC-AE-000398, Notifies NRC That Assessments of Effects of Fuel Rod Internal Pressure on 17% Oxidation Criterion of 10CFR50.46 Will Continue for Future Refueling Cycles Until Industry Issue Is Resolved (← links)
- NOC-AE-00039, Forwards Summary Rept of Test Results Taken During Startup & Power Ascension of Unit 2 Cycle 7 (← links)
- ST-HL-AE-5782, Forwards Rev 1 to Unit 1,Cycle 6,COLR & Rev 1 to Unit 2, Cycle 8,COLR IAW TS 6.9.1.6.d (← links)
- ST-HL-AE-5783, Submits 30-day Rept Re Significant Changes to Accepted Large Break LOCA ECCS Evaluation Model at Units 1 & 2 (← links)
- NOC-AE-000390, Submits Annual 10CFR50.46 Rept Re Revs to Accepted ECCS Evaluation Model at Stp,Units 1 & 2.Revised SBLOCA & LBLOCA Evaluation Models Continue to Meet Acceptance Criteria Identified in 10CFR50.46 (← links)
- NOC-AE-0019, Forwards Summary Rept of Test Results Taken During Startup & Power Ascension Following Installation of Fuel That Has Different Design (← links)
- NOC-AE-000348, Forwards Revised TS Bases Pages Changed Per 10CFR50.59.Ref Was Added to Bases Section 2.1.1 Because Figure Provides DNBR Curves Appropriate to Alternate DNB Operating Criteria (← links)
- NOC-AE-000358, Submits 30-day Rept Re Significant Changes to Accepted LBLOCA ECCS Evaluation Model for Stp,Per Requirements of 10CFR50.46(a)(3)(ii) (← links)
- NOC-AE-000346, Forwards Notice of Corrected Changes to Tech Specs Bases Submittal.Util Has Determined,No New Licensing Commitments Identified in Submittal (← links)
- NOC-AE-000297, Forwards Response to NRC RAI Re Proposed Amend to TS for Sf Storage Pool Rack Criticality Analysis with Soluble Boron Credit (← links)
- NOC-AE-000302, Informs That STP TS Bases Page B 3/4 9-2 Has Been Changed by Removing Wording of 10% Value for Clad Gap Iodine Isotopics. Copy of Revised TS Page,Encl (← links)
- ST-HL-AE-5697, Forwards Results for Hot,Full Flow Rod Drop Testing for Unit 1,Cycle 7 Performed on 970628,in Response to NRC Bulletin 96-001, Control Rod Insertion Problems (← links)
- ST-HL-AE-5698, Submits 30-day Rept Re Significant Changes to Accepted Small Break LOCA ECCS Evaluation Model,Per 10CFR50.46 (← links)
- ST-HL-AE-5604, Forwards STP Unit 2 Cycle 6 Colr (← links)
- ST-HL-AE-5516, Responds to NRC Bulletin 96-001, Control Rod Insertion Problems. Results of Fuel Assembly Testing Encl (← links)
- ST-HL-AE-5272, Provides Addl Info Re Proposed Special Test Exception 3.10.8 (← links)
- ST-HL-AE-5514, Fowards Annual Rept of ECCS Model Revs During 1996 (← links)
- ST-HL-AE-5414, Provides Addl Info Re Proposed Single ESF Train Mitigation Capabilities (← links)
- ST-HL-AE-5408, Forwards Results for Hot,Full Flow Rod Drop Testing in Unit 1 for Cycle 6,performed on 960518 & Hot Full Flow Rod Drop Testing of New Cycle 7 Core,Performed on 960608,per NRC Bulletin 96-001 (← links)
- ST-HL-AE-5404, Forwards Core Operating Limits Rept for South Tx Project Unit 1,Cycle 7 (← links)
- ST-HL-AE-5336, Confirms Acceptability of Refueling Practices W/Licensing Basis.Util Evaluation,Performed in Accordance w/10CFR50.59, Confirming That Routine Performance of Full Core off-loads Acceptable Encl (← links)
- ST-HL-AE-5280, Forwards Revised Table to ,Deleting Item for Hydrogen Analyzers & Revised Table to ,Revising Column Heading.Stp PSA Info Re Containment Isolation Also Encl (← links)
- ST-HL-AE-5261, Provides Addl Info Re Proposed Special Test Exception 3.10.8 (← links)
- ST-HL-AE-5271, Provides Addl Info Re Proposed Special Test Exception 3.10.8 (← links)
- ST-HL-AE-5247, Submits Annual Rept of ECCS Model Revs During 1995.No Changes Made to Either Small Break LOCA or Large Break LOCA Evaluation Models During 1995 (← links)
- ST-HL-AE-5208, Submits Response to Request for Addl Info Re Proposed Special Test Exception (← links)
- ST-HL-AE-5228, Forwards South Texas Project Electric Generating Station Unit 2 Cycle 5 Colr (← links)
- ST-HL-AE-5151, Forwards South Tx Project Electric Generating Station, Unit 1 Cycle 6,COLR (← links)