Pages that link to "PNO-IV-88-069, on 880824,util 100 H NSSS Acceptance Test Completed.Upon Completion of Review of Startup Test Results by Plant Operations Review Committee,Util Will Be in Position to Begin Commercial Operation.State of Tx Informed"
Jump to navigation
Jump to search
The following pages link to PNO-IV-88-069, on 880824,util 100 H NSSS Acceptance Test Completed.Upon Completion of Review of Startup Test Results by Plant Operations Review Committee,Util Will Be in Position to Begin Commercial Operation.State of Tx Informed:
Displayed 6 items.
- PNO-IV-99-037, on 990822,Region IV Dispatched Inspector to STP to Relieve Resident Inspectors & to Provide Assistance to STP Nuclear Operating Co,In Anticipation of Hurricane Bret.Representative Was Also Dispatched to FEMA Region VI (← links)
- PNO-IV-86-028A, on 860829,beam Lowered Through Equipment Hatch in Containment Bldg Fell,Striking Pipefitter on Head. Cause Not Stated.Pipefitter Suffered Massive Trauma & Died After Air Evacuation to Hosp.Press Release Issued (← links)
- PNO-IV-87-009A, on 870311,steam/water Hammer Event Occurred in Component Cooling Water Lines Servicing RHR HX Trains B & C.Caused by Operational Errors.After Cooldown from Hot Functional Testing,Sys Damage Will Be Repaired (← links)
- PNO-IV-87-009, on 870311,steam/water Hammer Event Occurred in Component Cooling Water Lines Servicing RHR HX Trains B & C. Caused by Operator Overlooking Step in Procedure.All Hot Functional Testing Put on Hold Pending Evaluation (← links)
- PNO-IV-90-034, on 900929,Unit 1 Manually Tripped & Will Remain Shutdown to Allow Repairs to Bellows in Low Pressure Turbine.Unit 2 Entered First Refueling Outage (← links)
- PNO-IV-93-033, on 931029,contractor Employee Suffered Heart Attack at Site Outside Protected Area.Employee Transported to Local Hosp Where He Later Died.State of Tx Informed (← links)