Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitle
05000482/LER-2003-002REACTOR VESSEL LEVEL INDICATING SYSTEM INOPERABLE FOR PERIOD LONGER THAN ALLOWED BY TECH. SPEC.
ET 02-0015, Changes to Technical Specification Bases - Revisions 6 Through 81 March 2002Changes to Technical Specification Bases - Revisions 6 Through 8
ET 08-0041, Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation.14 August 2008Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation.
ET 14-0034, Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process20 November 2014Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process
ET 20-0004, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)27 April 2020Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)
ET 21-0005, Operating Corp., License Amendment Request for a Risk-Informed Resolution to GSI-19112 August 2021Operating Corp., License Amendment Request for a Risk-Informed Resolution to GSI-191
IR 05000482/198700914 May 1987SALP Rept 50-482/87-09 for 860201-870228
IR 05000482/199302021 December 1993Insp Rept 50-482/93-20 on 931129-1203.No Violations Noted. Major Areas Inspected:Annual Exercise of Emergency Plan & Implementing Procedures
IR 05000482/20030063 February 2004IR 05000482-03-006; 10/4/03 - 12/31/03; Wolf Creek Generating Station. Fire Protection, Access Control to Radiologically Significant Areas, ALARA Planning and Controls
Information Notice 1990-22, Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units23 March 1990Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units
Information Notice 1992-16, Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown25 February 1992Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown
Information Notice 1993-27, Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization8 April 1993Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization
Information Notice 1993-62, Thermal Stratification of Water in BWR Reactor Vessels10 August 1993Thermal Stratification of Water in BWR Reactor Vessels
Information Notice 1993-89, Potential Problems with BWR Level Instrumentation Backfill Modifications26 November 1993Potential Problems with BWR Level Instrumentation Backfill Modifications
Information Notice 1994-36, Undetected Accumulation of Gas in Reactor Coolant System24 May 1994Undetected Accumulation of Gas in Reactor Coolant System
Information Notice 1994-52, Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 115 July 1994Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 1
Information Notice 1996-05, Partial Bypass of Shutdown Cooling Flow from Reactor Vessel18 January 1996Partial Bypass of Shutdown Cooling Flow from Reactor Vessel
Information Notice 1996-37, Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown18 June 1996Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown
Information Notice 1996-42, Unexpected Opening of Multiple Safety Relief Valves5 August 1996Unexpected Opening of Multiple Safety Relief Valves
Information Notice 1996-56, Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power22 October 1996Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power
Information Notice 1996-65, Undetected Accumulation of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown11 December 1996Undetected Accumulation of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown
Information Notice 1997-83, Recent Events Involving Reactor Coolant System Inventory Control During Shutdown5 December 1997Recent Events Involving Reactor Coolant System Inventory Control During Shutdown
Information Notice 1999-14, Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick5 May 1999Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick
ML02212003829 July 2002Technical Specifications for Amendment 123, Limited Removal of Suspension of Positive Reactivity Additions
ML03078013710 March 2003Docket 50-482: Wolf Creek Generating Station Changes to TS Bases - Revisions 9 Through 13
ML03115058529 January 1985Withdrawn NRC Generic Letter 1985-004: Operator Licensing Examinations
ML0407010903 March 2004Defense-in-Depth and Diversity Assessment (Non-Proprietary)
ML0428205627 October 2004Technical Specifications, Increasing Flexibility in Mode Restraints
ML05035025531 January 2005Technical Specifications, Amendment 157 Elimination of Requirements for Hydrogen Recombiners and Hydrogen Monitors
ML05077041510 March 2005Changes to Technical Specification Bases - Revisions 17 Through 19
ML05227007318 April 2005Event Notification Report for April 18, 2005
ML0607602418 March 2006Changes to Technical Specification Bases - Revisions 20 Through 23
ML0806704197 March 2008CDBI Findings
ML09170029630 July 2009Issuance of Amendment 183, Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, to Extend the Surveillance Frequency on ESFAS Slave Relays from 92 Days to 18 Months
ML10078012811 March 2010Changes to Technical Specification Bases - Revisions 41 Through 44
ML11270088026 August 20112011-08-Draft Written Examination
ML11270088726 August 201108 - Final Written Examination
ML12080A21612 March 2012Changes to Technical Specification Bases - Revisions 50 Through 54
ML15084A50911 March 2015Updated Safety Analysis Report (Usar), Revision 28, Chapter 7.0, Instrumentation and Controls
ML15084A53911 March 2015Updated Safety Analysis Report (Usar), Revision 28, Chapter 18.0, Response to NUREG-0737, Clarification of TMI Action Plan Requirements
ML15169A21328 July 2015Issuance of Amendment No. 212, Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation
ML16076A35710 March 2016Changes to Technical Specification Bases - Revisions 67 Through 73
ML16203A37631 May 2016Redacted Version of Revision 29 to Updated Safety Analysis Report, Chapter 7.0 - Instrumentation and Controls
ML16204A01131 May 2016Redacted Version of Revision 29 to Updated Safety Analysis Report, Chapter 18.0 - Response to NUREG-0737 Clarification of TMI Action Plan Requirements
ML16279A32712 September 2016Proposed Revised EAL Technical Basis Document
ML17123A20226 April 2017Enclosure to WO 17-0042 - WCNOC EAL Technical Basis Document
ML17151B0039 March 2017Revision 30 to Updated Final Safety Analysis Report, Chapter 7.0, Instrumentation and Controls
ML17151B0189 March 2017Revision 30 to Updated Final Safety Analysis Report, Chapter 18.0, Response to NUREG-0737, Clarification of TMI Action Plan Requirements.
ML17355A65015 November 201711 Final Written Exam
ML18093A8958 March 2018Revision 31 to Updated Safety Analysis Report, Chapter 7, Instrumentation and Controls