Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML20365A08830 December 2020Arkansas, Units 1 and 2; Grand Gulf, Unit 1; River Bend, Unit 1; and Waterford, Unit 3, Relief Request Number EN-20-RR-003, Proposed Alternative to Use American Society of Mechanical Engineers Code Case N-711-2, Alternative Examination CoveNondestructive Examination
ML21022A16922 January 2021NRR E-mail Capture - Entergy Fleet (ANO, Grand Gulf, River Bend, and Waterford) - Acceptance Review for RR EN-20-RR-003, Proposed Alternative to Use ASME Code Case N-711-2
ML21299A00328 October 2021and Waterford Steam Electric Station, Unit 3 - Approval of Request for Alternative EN-20-RR-003 from Certain Requirements of the ASME Code
W3F1-2017-0082, Submittal of the Inservice Inspection Plan and Containment Inservice Inspection Plan for the Fourth 10-Year Interval4 December 2017Submittal of the Inservice Inspection Plan and Containment Inservice Inspection Plan for the Fourth 10-Year IntervalWeld Overlay
Probabilistic Risk Assessment
Nondestructive Examination
VT-2
Incorporated by reference
Aging Management
Large early release frequency
Moisture barrier
License Renewal
Control of Heavy Loads
Dissimilar Metal Weld
Scaffolding
W3F1-2018-0065, Request for Relief from ASME Section XI Volumetric Examination Requirements - Third 10-Year Interval, W3-ISI-03230 November 2018Request for Relief from ASME Section XI Volumetric Examination Requirements - Third 10-Year Interval, W3-ISI-032VT-2
Pressure Boundary Leakage