Issue date | Title | |
---|---|---|
ML100320264 | 27 January 2010 | License Amendment Request, Measurement Uncertainty Recapture Power Uprate |
ML100480781 | 4 February 2010 | License Amendment Request Measurement Uncertainty Recapture Power Uprate Supplemental Information |
ML101200269 | 29 April 2010 | License Amendment Request, Measurement Uncertainty Recapture Power Uprate, Response to Request for Additional Information |
ML101310604 | 6 May 2010 | License Amendment Request Revised Cumulative Core Burnup Applicability Limit for Heatup and Cooldown Curves, Low Temperature Overpressure Protection System Setpoint, and Ltops Enable Temperature |
ML111530328 | 2 June 2011 | Completion of Temporary Instruction (Ti) 184, Availability and Readiness Inspection of Severe Accident Mitigation Guidelines (Samgs) at Region II Facilities - Revision |
ML11256A023 | 30 September 2011 | NUREG-1953 Confirmatory Thermal-Hydraulic Analysis to Support Specific Success Criteria in the Standardized Plant Analysis Risk Models - Surry and Peach Bottom. |
ML11297A119 | 13 October 2011 | Submittal of Annual Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J |
ML12304A021 | 26 October 2012 | Initial Exam 2012-301 Final Sim in-Plant JPMs |
ML13106A140 | 30 April 2013 | Relief from the Requirements of the ASME Code Section XI for the Fourth Ten-Year Inservice Inspection Program Interval |
ML15041A720 | 4 February 2015 | Proposed License Amendment Request Clarification of Reactor Coolant System Heatup and Cooldown Limitations Technical Specification Figures Response to Request for Additional Information |
ML15120A227 | 1 May 2015 | Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 12, 2015 |
ML15313A141 | 31 March 2015 | Topical Report, VEP-FRD-41-NP-A, Rev. 0.2, VEPCO Reactor System Transient Analyses Using the Retran Computer Code, March 2015 |
ML16130A564 | 2 May 2016 | NRC Regulatory Issue Summary 2015-16 Planned Licensing Action Submittals |
ML18085A159 | 19 March 2018 | Response to Request for Additional Information Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules |
ML18085A160 | 30 September 2015 | WCAP-18028-NP, Rev. 01, Extended Beltline Pressure Vessel Fluence Evaluations Applicable to Surry, Units 1 and 2. |
ML18085A161 | 31 October 2017 | WCAP-18242-NP, Rev. 0, Surry, Units 1 and 2 Time-Limited Aging Analysis on Reactor Vessel Integrity for Subsequent License Renewal. |
ML18085A164 | 31 October 2017 | WCAP-18243-NP, Rev. 0, Surry, Units 1 and 2, Heatup and Cooldown Limit Curves for Normal Operation. |
ML18127B723 | 14 May 2018 | Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 22, 2018 |
ML19044A556 | 4 March 2019 | License Renewal Environmental Site Audit Plan Regarding the Surry Power Station, Units 1 and 2, Subsequent License Renewal Application |
ML19058A583 | 27 September 2018 | UFSAR Chapter 14-18 |
ML19095A602 | 2 April 2019 | Enclosure 2 - SLRA Mark-Ups Change Notice 2 |
ML19095A605 | 31 March 2019 | Enclosure 5 - Topical Report WCAP-15550-NP, Rev 2, Technical Justification for Eliminating Large Primary Loop Pipe Rupture as the Structural Design Basis for Surry Units 1 and 2 Nuclear Power Plants for the Subsequent License Renewal Progra |
ML19107A020 | 16 April 2019 | Audit Need Update Tracking Spreadsheet |
ML19128A079 | 30 May 2019 | Report for the in Office Regulatory Audit Regarding the Subsequent License Renewal Application Review (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024 |
ML19274C676 | 31 October 2019 | NUREG-1437 - Generic Environmental Impact Statement for License Renewal of Nuclear Plants Supplement 6, Second Renewal Regarding Subsequent License Renewal for Surry Power Station Units 1 and 2, Draft Report for Comment |
ML19360A020 | 27 December 2019 | SER 2019-12-23 for ADAMS |
ML20338A542 | 3 December 2020 | Proposed License Amendment Request, Update of the Loss of Coolant Accident Alternate Source Term Dose Analysis |
ML21175A185 | 20 August 2021 | Issuance of Amendment Nos. 304 and 304 Leak-Before-Break for Pressurizer Surge, Residual Heat Removal, Safety Injection Accumulator, Reactor Coolant System Bypass and Safety Injection Lines |
ML21208A367 | 30 September 2020 | 2 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis (EPID L-2020-LRO-0076) - Redacted |
ML21208A409 | 30 September 2020 | 2 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control (EPID L-2020-LRO-0076) - Redacted |
ML21208A429 | 30 September 2020 | 2 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System (Epids L-2020-LRO-0076) - Redacted |
ML21210A135 | 30 September 2020 | 2 to Updated Final Safety Analysis Report, Chapter 15, Structures and Construction (EPID L-2020-LRO-0076) - Redacted |
ML21210A139 | 30 September 2020 | 2 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary (EPID L-2020-LRO-0076) - Redacted |
ML22171A013 | 20 June 2022 | Units, Units 1 and 2 - Proposed License Amendment Request Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications |
ML22227A177 | 15 August 2022 | License Amendment Request - Proposed Technical Specifications Change for New Fuel and Spent Fuel Storage Areas |
ML23136B139 | 29 June 2023 | Issuance of Amendment No. 313 Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications |