Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleFromTo
L-PI-10-077, Supplement to License Amendment Request to Exclude the Dynamic Effects Associated with Certain Postulated Pipe Ruptures from the Licensing Basis Based Upon Application of Leak-Before-Break Methodology Additional ...23 July 2010Supplement to License Amendment Request to Exclude the Dynamic Effects Associated with Certain Postulated Pipe Ruptures from the Licensing Basis Based Upon Application of Leak-Before-Break Methodology Additional ...Xcel Energy
Schimmel M
Office of Nuclear Reactor Regulation
Document Control Desk
L-PI-10-094, Supplement to License Amendment Request to Exclude the Dynamic Effects Associated with Certain Postulated Pipe Ruptures from the Licensing Basis Based Upon Application of Leak-Before-Break Methodology - Response to RAI8 October 2010Supplement to License Amendment Request to Exclude the Dynamic Effects Associated with Certain Postulated Pipe Ruptures from the Licensing Basis Based Upon Application of Leak-Before-Break Methodology - Response to RAIXcel Energy
Schimmel M
Office of Nuclear Reactor Regulation
Document Control Desk
L-PI-11-006, Supplement to License Amendment Request to Exclude the Dynamic Effects Associated with Certain Postulated Pipe Ruptures from the Licensing Basis Based Upon Application of Leak-Before-Break Methodology - Response to RAI14 January 2011Supplement to License Amendment Request to Exclude the Dynamic Effects Associated with Certain Postulated Pipe Ruptures from the Licensing Basis Based Upon Application of Leak-Before-Break Methodology - Response to RAIXcel Energy
Schimmel M
Office of Nuclear Reactor Regulation
Document Control Desk
ML10328039814 December 2010RAI, Related to Request to Exclude the Dynamic Effects Associated with Certain Postulated Pipe Ruptures from the Licensing Basis Based Upon Application of LBB MethodologyThomas Wengert
Plant Licensing Branch III
Xcel Energy
Schimmel M
ML19332F3621 December 1989Responds to Generic Ltr 89-21 Re Implementation Status of USI Requirements at Facilities.Pra to Address USI A-17, Sys Interactions in Nuclear Power Plants Will Be Completed in Feb 1993Northern States Power Company
Parker T
Office of Nuclear Reactor Regulation
ML20092L11615 June 1984Submits Plans for Resolution of Asymmetric LOCA Loads Issue, Per Generic Ltr 84-04.Westinghouse Mechanistic Fracture Evaluation & Exemption Request from GDC 4 Requirements Will Be Submitted by 840915Northern States Power Company
Musolf D
Office of Nuclear Reactor Regulation
ML20116N69129 April 1985Provides Updated Info to 841024 Submittal Re Plans for Resolving Generic Issue A-2 on Asymmetric Blowdown Loads. Westinghouse Authorized to Identify & Qualify Applicable Unit 2 Pipe Sections by 850701Northern States Power Company
Musolf D
Office of Nuclear Reactor Regulation
ML20205G66821 October 1985Requests Exemption from Requirements of 10CFR50(a),GDC 4 & Forwards Nonproprietary WCAP-10928, Technical Bases for Eliminating Large Primary Loop Pipe Rupture as Structural Design Basis for Prairie Island Unit 2 & WCAP-10930Northern States Power Company
Musolf D
Office of Nuclear Reactor Regulation
NRC Generic Letter 1989-2119 October 1989NRC Generic Letter 1989-021: Request for Information Concerning Status of Implementation of Unresolved Safety Issue (USI) RequirementsPartlow J
Office of Nuclear Reactor Regulation