Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Entered dateEvent description
ENS 444018 August 2008 20:50:00Arizona Public Service Co. made an offsite notification to Maricopa County Environmental Services at 1520 MST on 8/8/08 to report a loss of power to the Palo Verde Nuclear Generating Station drinking water supply pumps. The pumps were out of service on 8/8/08 between the hours of 0532 and 0620 MST. Full service has been restored. The licensee notified the NRC Resident Inspector.
ENS 4663422 February 2011 14:29:00Arizona Public Service Co. made an offsite notification to the Maricopa County Environmental Services Division at 0909 MST on February 22, 2011, to report a loss of power to the Palo Verde Nuclear Generating Station drinking water supply pumps which resulted in the depressurization of the site domestic water supply header. The pumps were out of service on February 21, 2011, between the hours of 2001 and 2300 MST. Full service has been restored. The loss of power was related to the loss of Startup Transformer A-E-NAN-X02 as reported in ENS #46633 at 0023 on February 21, 2011. The NRC Resident Inspectors have been notified.
ENS 4760418 January 2012 12:30:00A non-licensed contract employee supervisor had a confirmed positive for an illegal substance taken during a pre-access fitness-for-duty test. The contract employee's access to the plant has been terminated. Contact the Headquarters Operations Officer for additional details. The licensee informed the NRC Resident Inspector.