Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Entered dateEvent description
ENS 5403126 April 2019 20:19:00At 1147 (CDT) on 4/26/19, a through wall leak (reported as 1 drop every 1 to 2 minutes) was identified and confirmed by operation and NDE (Non-Destructive Examination) personnel on the Standby Liquid Control injection line during pressure testing activities. The line is 1.5 inch in diameter and classified as an ASME Section Ill, Class 1 line. The leak is currently isolated from the reactor vessel by a danger tagged manual valve. The licensee notified the NRC Resident Inspector.