Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Entered dateEvent description
ENS 4349216 July 2007 18:09:00

On 07/17/07 at 0700 hours CDT the Monticello Nuclear Generating Plant's (MNGP) Technical Support Center (TSC) will begin relocation to a new facility. The relocation activities include implementation of compensatory measures to maintain the TSC functions during the transition. The compensatory measures include having the Emergency Director report to the Control Room and co-locating the remaining TSC staff at the EOF should an event declared requiring Emergency Response Organization (ERO) activation. The ERO has previously successfully demonstrated the ability to implement these compensatory measures. The relocation and testing of equipment in the new TSC are scheduled to be complete(d) on or before 07/23/07. The site Emergency Response Organization has been notified of the relocation and instructed on the planned compensatory measures to be implemented during the move. MNGP will notify the NRC upon completion of the relocation and declaration of TSC operability in the new location. This event is considered reportable per 10 CFR 50.72 (b)(3)(xiii). The licensee has notified the NRC Resident Inspector.

  • * * UPDATE ON 07/19/07 AT 1546 EDT FROM GERALD HOLTHAUS TO MACKINNON * * *

On 07/19/07 at 1400 hours CDT the Monticello Nuclear Generating Plant's Technical Support Center (TSC) was declared operable after its relocation to a new facility. Relocation and testing activities have been completed and the Emergency Response Organization has been notified of the cessation of compensatory measures. NRC R3DO (Eric Duncan) notified. The licensee has notified the NRC Resident Inspector.