Issue date | Title | |
---|---|---|
05000220/FIN-2018001-01 | Potential Failure to Submit an 8-Hour Event Notification for a Valid Actuation of HPC | |
05000410/FIN-2015001-02 | Failure to Perform an Adequate Review of Planned Work Activities Results in a Manual Reactor Scram | |
05000410/FIN-2018003-02 | Minor Violation | |
05000410/LER-2013-004 | Manual Reactor Protection System Actuation due to Loss of Reactor Recirculation Flow | |
05000410/LER-2015-002 | Manual Reactor Scram Due to Unexpected Reactor Water Level Change | |
05000410/LER-2015-003 | 31 March 2016 | Primary Containment Isolation Function for some valves not maintained during Surveillance Testing LER 15-003-01 for Nine Mile Point, Unit 2, Regarding Primary Containment Isolation Function For Some Valves Not Maintained During Surveillance Testing |
ENS 40998 | Unit 1 Manually Scrammed Due to Oscillating Reactor Vessel Water Level | |
ENS 48481 | High Pressure Coolant Injection Actuation Signal | |
ENS 52950 | Automatic Reactor Scram on Low Reactor Vessel Water Level | |
ENS 53565 | En Revision Imported Date 8/29/2018 | |
IR 05000220/1985003 | 18 April 1985 | Exam Rept 50-220/85-03 on 850311-15.Exam results:35 Reactor Operators & 32 Senior Reactor Operators Passed Exam & 4 Reactor Operators & 1 Senior Reactor Operator Failed |
IR 05000220/1993001 | 12 November 1993 | Insp Repts 50-220/93-01 & 50-410/93-01 on 930919-1030. Violations Noted.Major Areas Inspected:Major Components & Sys for Leakage,Alignment,Lubrication,Cooling Water Supply |
IR 05000220/1999006 | 14 September 1999 | Insp Repts 50-220/99-06 & 50-410/99-06 on 990620-0731.NCVs Noted.Major Areas Inspected:Licensee Operations,Engineering, Maint & Plant Support |
IR 05000220/2003005 | 5 November 2003 | IR 05000220-03-005, 05000410-03-005, on 06/29/2003 - 09/27/2003, for Nine Mile Point, Units 1 and 2; Permanent Plant Modifications; and Other Activities |
IR 05000220/2004005 | 26 January 2005 | IR 05000220-04-005, 05000410-04-005; on 10/01/2004 - 12/31/2004; Nine Mile Point, Units 1 and 2; Licensed Operator Requalification Program and Operability Evaluations |
IR 05000220/2004007 | 18 October 2004 | IR 05000220-04-007 and IR 05000410-04-007, on 08/16/2004 - 09/30/2004, Nine Mile Point, Units 1 and 2; Safety System Design and Performance Capability |
IR 05000220/2005004 | 29 October 2005 | IR 05000220/2005-004, 05000410/2005-004; 07/01/05 - 09/30/05; Nine Mile Point, Units 1 and 2; Operator Performance During Non-routine Evolutions and Events, and Operability Evaluations |
IR 05000220/2006003 | 7 August 2006 | IR 05000220-06-003 and IR 05000410-06-003; 04/01/06 - 06/30/06; Nine Mile Point, Units 1 & 2 Operability Evaluations and Event Followup |
IR 05000220/2007006 | 3 August 2007 | IR 05000220-07-006, 05000220-07-006, on Nine Mile Point Nuclear Station, Units 1 and 2; Biennial Baseline Inspection of the Identification and Resolution of Problems |
IR 05000220/2008002 | 5 May 2008 | IR 05000220-08-002, 05000410-08-002; 01/01/08 - 03/31/08; Nine Mile Point Nuclear Station, Units 1 and 2; Surveillance Testing |
IR 05000220/2008005 | 27 January 2009 | IR 05000220-08-005, 05000410-08-005 on 10/01/08 - 12/31/08 for Nine Mile Point, Units 1 and 2, Maintenance Risk Assessments and Emergent Work Control |
IR 05000220/2009005 | 29 January 2010 | IR 05000220-09-005 and IR 05000410-09-005 10/01/2009 - 12/31/2009; Nine Mile Point Nuclear Station, Units 1 and 2; Maintenance Risk Assessment, and Identification and Resolution of Problems |
IR 05000220/2010002 | 6 May 2010 | IR 05000220-10-002 and 05000410-10-002 on 01/01/10 - 03/31/10 for Nine Mile Point, |
IR 05000220/2010003 | 3 August 2010 | IR 05000220-10-003, 05000410-10-003, on 04/01/2010 - 06/30/2010, Nine Mile Point Nuclear Station, Units 1 and 2, Refueling and Other Outage Activities |
IR 05000220/2014002 | 28 April 2014 | IR 05000220-14-002, 05000410-14-002; 01/01/2014 - 03/31/2014; Nine Mile Point Nuclear Station, LLC, (NMPNS) Units 1 and 2; Plant Modifications, Follow-Up of Events and Notices of Enforcement Discretion |
IR 05000220/2014003 | 7 August 2014 | IR 05000220-14-003, 05000410-14-003; on 4/1/14 - 6/30/14; Nine Mile Point Nuclear Station Units 1 & 2; Operability Determinations & Functionality Assessments, Problem Identification & Resolution, and Follow-Up of Events & Notices of Enforce |
IR 05000220/2015001 | 6 May 2015 | IR 05000220/2015001, 05000410/2015001; 01/01/2015 - 03/31/2015; Nine Mile Point Nuclear Station (Nmpns), Units 1 and 2; Follow-Up of Events and Notices of Enforcement Discretion |
IR 05000220/2015004 | 4 February 2016 | Integrated Inspection Report 05000220/2015004 and 05000410/2015004 |
IR 05000220/2016002 | 8 August 2016 | Integrated Inspection Report 05000220/2016002 and 05000410/2016002 and Exercise of Enforcement Discretion |
IR 05000220/2018001 | 9 May 2018 | Integrated Inspection Report 05000220/2018001 and 05000410/2018001 |
IR 05000220/2018002 | 8 August 2018 | Integrated Inspection Report 05000220/2018002 and 05000410/2018002 |
IR 05000220/2018003 | 14 November 2018 | Integrated Inspection Report 05000220/2018003 and 05000410/2018003 and NRC Office of Investigations Report 1-2018-002 |
IR 05000220/2018004 | 13 February 2019 | Integrated Inspection Report 05000220/2018004 and 05000410/2018004 |
IR 05000220/2021002 | 10 August 2021 | Integrated Inspection Report 05000220/2021002 and 05000410/2021002 and Independent Spent Fuel Storage Installation Report 07201036/2021002 |
IR 05000220/2021004 | 19 May 2022 | Reissued Integrated Inspection Report 05000220/2021004 and 05000410/2021004 |
IR 05000220/2022002 | 8 August 2022 | Integrated Inspection Report 05000220/2022002 and 05000410/2022002 and Independent Spent Fuel Storage Installation Report 07201036/2022001 |
IR 05000410/1986034 | 20 October 1986 | Exam Rept 50-410/86-34OL of Exams Administered on 860722-25. Exam Results:Five Reactor Operator Candidates & Five Out of Nine Senior Reactor Operator Candidates Passed Overall |
IR 05000410/1986038 | 7 August 1986 | Insp Rept 50-410/86-38 on 860714-24.No Violation Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings, Preoperational Test Results Evaluation Review & Power Ascension Test Program |
Information Notice 1990-22, Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units | 23 March 1990 | Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units |
Information Notice 1992-16, Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown | 25 February 1992 | Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown |
Information Notice 1993-27, Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization | 8 April 1993 | Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization |
Information Notice 1993-62, Thermal Stratification of Water in BWR Reactor Vessels | 10 August 1993 | Thermal Stratification of Water in BWR Reactor Vessels |
Information Notice 1993-89, Potential Problems with BWR Level Instrumentation Backfill Modifications | 26 November 1993 | Potential Problems with BWR Level Instrumentation Backfill Modifications |
Information Notice 1994-36, Undetected Accumulation of Gas in Reactor Coolant System | 24 May 1994 | Undetected Accumulation of Gas in Reactor Coolant System |
Information Notice 1994-52, Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 1 | 15 July 1994 | Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 1 |
Information Notice 1996-05, Partial Bypass of Shutdown Cooling Flow from Reactor Vessel | 18 January 1996 | Partial Bypass of Shutdown Cooling Flow from Reactor Vessel |
Information Notice 1996-37, Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown | 18 June 1996 | Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown |
Information Notice 1996-42, Unexpected Opening of Multiple Safety Relief Valves | 5 August 1996 | Unexpected Opening of Multiple Safety Relief Valves |
Information Notice 1996-56, Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power | 22 October 1996 | Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power |
Information Notice 1996-65, Undetected Accumulation of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown | 11 December 1996 | Undetected Accumulation of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown |