Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitle
IR 05000263/201800331 October 2018NRC Integrated Inspection Report 05000263/2018003 and 07200058/2018001
IR 07200058/200700119 November 2007IR 07200058-07-01(DNMS), on 06/28/2007, 07/25-27/2007, 07/30 - 08/01/2007; and 08/29-31/2007, on-site and on 11/13/2007, in-office Review, Monticello Nuclear Generating Plant
L-HU-07-021, Units 1 and 2, Request for Approval of a Combined Nuclear Management Company Emergency Plan7 August 2007Units 1 and 2, Request for Approval of a Combined Nuclear Management Company Emergency Plan
L-MT-03-028, Emergency Plan Implementing Procedure A.2-101, Revision 30, and Emergency Plan23 April 2003Emergency Plan Implementing Procedure A.2-101, Revision 30, and Emergency Plan
L-MT-03-073, Revisied Emergency Plan Implementing Procedures17 October 2003Revisied Emergency Plan Implementing Procedures
L-MT-08-045, Response to Requests for Additional Information for License Amendment Request: Revision to the Allowable Value and Channel Calibration Surveillance Interval for the Recirculation Riser Differential Pressure - High Function8 September 2008Response to Requests for Additional Information for License Amendment Request: Revision to the Allowable Value and Channel Calibration Surveillance Interval for the Recirculation Riser Differential Pressure - High Function
L-MT-12-103, Final Response to NRC Request for Information Per 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident27 November 2012Final Response to NRC Request for Information Per 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
L-MT-13-017, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)28 February 2013Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
L-MT-13-051, MNGP Updated Final Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident16 September 2013MNGP Updated Final Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
L-MT-14-052, Mngp'S Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)30 June 2014Mngp'S Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)
L-MT-14-082, Exemption Request for Dry Shielded Canisters 11-16 Dye Penetrant Examinations, Supplemental Information3 November 2014Exemption Request for Dry Shielded Canisters 11-16 Dye Penetrant Examinations, Supplemental Information
L-MT-15-047, Update of Information Related to NRC Order Update of Information Related to NRC Order EA-12-049, Mitigation Strategies for Beyond-Design-Basis External Events12 October 2015Update of Information Related to NRC Order Update of Information Related to NRC Order EA-12-049, Mitigation Strategies for Beyond-Design-Basis External Events
L-MT-15-090, Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order EA-13-109) Including Phase 1.17 December 2015Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order EA-13-109) Including Phase 1..
L-MT-16-021, Changes to the Emergency Plan, Revision 4729 April 2016Changes to the Emergency Plan, Revision 47
L-MT-16-024, Flood Hazard Reevaluation Report21 April 2016Flood Hazard Reevaluation Report
L-MT-17-029, Changes to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan18 April 2017Changes to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan
L-MT-17-047, Notification of Full Compliance of Required Action for NRC Order EA-12-049 Mitigation Strategies for Beyond-Design-Basis External Event6 July 2017Notification of Full Compliance of Required Action for NRC Order EA-12-049 Mitigation Strategies for Beyond-Design-Basis External Event
L-MT-17-053, Redacted - Monticello and Independent Spent Fuel Storage Installation - Exemption Request for Nonconforming Dye Penetrant Examinations of Dry Shielded Canisters (Dscs) 11 Through 1518 October 2017Redacted - Monticello and Independent Spent Fuel Storage Installation - Exemption Request for Nonconforming Dye Penetrant Examinations of Dry Shielded Canisters (Dscs) 11 Through 15
L-MT-17-065, License Amendment Request to Revise the Emergency Action Level Scheme - Supplement and Response to Requests for Additional Information25 September 2017License Amendment Request to Revise the Emergency Action Level Scheme - Supplement and Response to Requests for Additional Information
L-MT-17-066, Supplemental Information for the Notification of Full Compliance of Required Action for NRC Order EA-12-049 Mitigation Strategies for Beyond-Design-Basis External Events28 September 2017Supplemental Information for the Notification of Full Compliance of Required Action for NRC Order EA-12-049 Mitigation Strategies for Beyond-Design-Basis External Events
L-MT-18-024, Changes to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan24 April 2018Changes to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan
L-MT-18-044, Changes to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan28 August 2018Changes to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan
L-MT-19-020, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions ..25 April 2019Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions ..
L-MT-22-026, Changes to the Emergency Plan19 July 2022Changes to the Emergency Plan
ML02171072510 June 2002Emergency Plan Implementing Procedures
ML02178004711 June 2002Part 1 of 10, Submittal of Revision No. 19 to Updated Safety Analysis Report for Monticello, Exhibit a, Monticello Nuclear Generating Plant, Report of Changes, Tests & Experiments
ML0222803548 August 2002DAEC Emergency Planning Department Procedure Transmittal Acknowledgment Memo
ML02333046715 November 2002Emergency Plan Implementing Procedures
ML03041016314 October 2002Initial Submittal of the Scenarios for the Monticello Initial Examination - Oct. 2002
ML03041025514 October 2002Outline Submittal for the Monticello Initial Examination - Oct. 2002
ML04013046423 September 2003Final As-Administered Scenarios for the Monticello Initial Examination - Sept 2003
ML04013067323 September 2003Initial Submittal of the Scenarios for the Monticello Initial Examination - Sep 2003
ML04013072723 September 2003NRC Comments on the Operating Test for the Monticello Initial Examination - Sept 2003
ML0409900852 April 2004Rev. 32 to Emergency Plan Implementing Procedure A.2-101, Classification of Emergencies.
ML0515800052 June 2005Audit and Review Plan for Plant Aging Management Reviews and Programs for the Monticello Generating Plant
ML0516000082 June 2005Audit & Review Plan for Plant Aging Management Reviews & Programs for Monticello Nuclear Generating Plant
ML05285046112 October 2005October 12, 2005 - Audit and Review Report for Plant Aging Management Reviews and Programs for Monticello Nuclear Generating Plant
ML06019007231 January 2006NUREG-1437 S26 Dfc, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 26, Regarding Monticello Nuclear Generating Plant, Draft Report for Comment
ML08366029631 December 2008IR 072-00058-08-003; Northern States Power Company; on 06/30/2008 - 07/03/2008 - 08/18-22/2008 09/08-11/2008; Monticello Nuclear Generating Plant (Dnms), NRC Inspection Report
ML12215A28317 April 2015G20110563 - LTR to Lochbaum -- Draft Director'S Decision Re 2.206 Petition Re Boiling Water Reactors with Mark I and Mark II Containment Designs
ML12215A31417 April 2015Proposed Director'S Decision - 2.206 Petition Re Boiling Water Reactors with Mark I and Mark II Containment Designs
ML13220A13925 November 2013Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies
ML14136A28912 May 201414C4229-RPT-001, Revision 3, Monticello Nuclear Generating Plant Seismic Hazard and Screening Report.
ML14177A64527 June 2014Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations
ML14198A39817 July 2014Revised Emergency Plan and Emergency Plan Implementing Procedures (Epips)
ML14199A37016 July 2014Exemption Request for Dry Shielded Canisters 11 - 16 Due to Nonconforming Dye Penetrant Examinations
ML15069A11217 April 2015G20110563 - Licensee Letter Regarding Draft Director'S Decision to Licensee'S with Mark I and II Containment Design
ML15082A1672 April 2015Interim Staff Evaluation Related to Overall Integrated Plant in Response to Order EA-13-109,Severe Accident Capable Hardened Vents
ML15275A02329 September 2015Monticello ISFSI - Exemption Request for Nonconformincg Dry Shielded Canister Dye Penetrant Examinations
ML16054A41626 January 2016Revision 33 to the Updated Final Safety Analysis Report, Section 2, Site and Environs