Semantic search
Jump to navigation
Jump to search
Issue date | Title | From | To | |
---|---|---|---|---|
ML031140549 | 7 November 1991 | Withdrawn NRC Generic Letter 1991-018: Information to Licensees Regarding Two NRC Inspection Manual Sections on Resolution of Degraded and Nonconforming Conditions and on Operability | Partlow J Office of Nuclear Reactor Regulation | |
ML11024A045 | 24 January 2011 | IR 05000352-10-005; 05000353-10-005; 10/01/2010-12/31/2010; Limerick Generating Station, Units 1 and 2; Routine Integrated Report | Paul Krohn Reactor Projects Region 1 Branch 4 | Exelon Pacilio M |
ML20086R335 | 19 December 1991 | Requests Relief from ASME Boiler & Pressure Vessel Code, Section XI to Repair or Replace ASME Section III Code Class 3 Pipe Installed at Facility.Flaw Identified in Section of 3-inch Diameter Emergency Svc Water Piping | Exelon (FORMERLY PHILADELPHIA ELECTRIC Beck G | Office of Information Resources Management |
ML20094H384 | 3 March 1992 | Proposed One Time TS Change Request 92-04-2 to Extend Allowed Outage Time for ECCS Sys Supported by B Loop of ESW | Exelon (FORMERLY PHILADELPHIA ELECTRIC | |
ML20134F034 | 4 February 1997 | Forwards Response to Re Request for Info Per 10CFR50.54(f) Concerning Adequacy & Availability of Design Bases Info | Exelon (FORMERLY PHILADELPHIA ELECTRIC Fetters D | Office of Information Resources Management |
ML20137C353 | 14 March 1997 | Forwards Response to GL 96-05 Re Periodic Verification of Design Basis Capability of SR MOVs | Exelon (FORMERLY PHILADELPHIA ELECTRIC Hunger G | Office of Information Resources Management |
NRC Generic Letter 1990-05 | 15 June 1990 | NRC Generic Letter 1990-005: Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1, 2, and 3 Piping | Partlow J Office of Nuclear Reactor Regulation | |
RA-16-059, Proposed Alternative to Utilize Code Case N5134, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 | 14 June 2016 | Proposed Alternative to Utilize Code Case N5134, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 | Exelon James Barstow | Office of Nuclear Reactor Regulation Document Control Desk |
RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 | 24 September 2014 | Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 | Exelon James Barstow | Office of Nuclear Reactor Regulation Document Control Desk |
RS-16-041, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1. | 28 January 2016 | Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1. | Exelon David Gudger | Office of Nuclear Reactor Regulation Document Control Desk |