Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitle
05000305/FIN-2010007-01Calculation Methodology Did Not Represent Actual Plant Equipment Configuration
05000305/LER-2011-001Auxiliary Building Special Ventilation Inoperability Results in Prohibited Technical Specification Condition
05000305/LER-2012-006Train A Special Ventilation Inoperable for Longer Period than Allowed due to Charcoal Filter Efficiency
05000305/LER-2012-009Missed Verification of Offsite Circuit Breaker Alignment and Power Availability, Within Completion Time
ENS 40950Control Room Emergency Zone Boundary Outside Design Basis
ENS 41226Safety Injection Accumulator Isolation Valves Found Closed and Their Breakers Locked Off.
ENS 42509Shield Building Ventillation System Declared Inoperable
ENS 42557Potential Loss of Rhr
ENS 43633Auxiliary Building Special Ventilation and Shield Building Ventilation Systems Inoperable
ENS 43651Shield Building Ventilation System Inoperable
ENS 43689Potential Unavailability of Two Way Radio System to Support Safe Shutdown
ENS 44616Non-Functional Steam Exclusion Barrier
ENS 44746Non-Functional Steam Exclusion / Control Room Exclusion Zone (Crez) Barrier
ENS 44938Non-Functional Steam Exclusion Barrier
ENS 44994Reactor Shutdown Required by Technical Specifications
ENS 46562Steam Exclusion Door Declared Inoperable
ENS 47755Potential for Aerial Lift to Impact Service Water Piping During Seismic Event
ENS 47871Both Trains of Residual Heat Removal Declared Inoperable
ENS 47873Both Trains of Residual Heat Removal System Declared Inoperable
ENS 48209Minor Thru-Wall Leak at Weld in Safety Injection Suction Piping
IR 05000305/200200325 July 2002IR 05000305-02-003, on April 1-June 30, 2002, Nuclear Management Co., Llc. Operability Evaluations, Surveillance Testing & Event Followup. Non-Cited Violations Noted
IR 05000305/200700210 May 2007IR 05000305-07-002, 01/01/2007 - 03/31/2007; Kewaunee Power Station. Adverse Weather, Maintenance Effectiveness, Maintenance Risk Assessments and Emergent Work Control, Operability Evaluations, Refueling and Other Outage Activities
IR 05000305/20070061 June 2007IR 05000305-07-006, on 01/29/2007 - 03/02/2007; Kewaunee Power Station; Component Design Basis Inspection (CDBI)
IR 05000305/20070111 February 2008IR 05000305-07-011; on 10/26/2007-12/19/2007; Kewaunee Power Station; Supplemental Inspection 95002, Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area
IR 05000305/20090035 August 2009IR 05000305-09-003, on 04/01/2009 - 06/30/2009, Kewaunee Power Station, Operability Evaluations, Component Design Bases Inspection, Surveillance Testing; and Follow Up of Events and Notices of Enforcement Discretion
IR 05000305/201000712 March 2010IR 05000305-10-007 (DRS) on 01/25/2010 - 02/12/2010 for Kewaunee Power Station, Evaluations of Changes, Tests or Experiments and Permanent Plant Modifications
IR 05000305/201100328 July 2011IR 05000305-11-003, 4/01/2011 - 6/30/2011; Kewaunee Power Station; Maintenance Effectiveness, Operability Evaluations, and Identification and Resolution of Problems
Information Notice 1996-44, Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly5 August 1996Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly
ML0214402327 May 2002Proposed Amendment 180 Application for Technical Specification Change Re Missed Surveillance & Adoption of Technical Specifications Bases Control Program) Using Consolidated Line Item Improvement Process
ML02268063324 September 2002Technical Specifications, Revise Requirements for Missed Surveillance Using the Consolidated Line Item Improvement Process, (MB5185) - S105735
ML02288037511 October 2002Correction to Issuance of Amendment 163 - S105862
ML04042041830 January 2004Responses to NRC Clarification Questions on Responses to Requests for Additional Information Regarding License Amendment Request 195, Stretch Power Uprate
ML0416100461 June 2004License Amendment Request 204 to Technical Specifications; Extend Reactor Trip System and Engineered Safety Features Actuation System Surveillance Test Intervals as Evaluated in WCAP-15376-P-A
ML04357001714 December 2004from NMC Re Technical Evaluation of Proposed Method of Class 3 Pipe Leak Operability Determinations
ML05046022014 February 2005IR 05000305-04-009 on 10/01/2004 - 12/31/2004 for Kewaunee Nuclear Power Plant; Fire Protection, Refueling and Outage Activities, Identification and Resolution of Problems, Event Follow-up, Other Activities and Cross-Cutting Areas
ML05144029726 October 2004Revision to Emergency Action Levels, Facility Operating License as Amended Through October 21, 2004 Document
ML05304035224 February 2011Current Facility Operating License DPR-43, Tech Specs, Revised 10/07/2015
ML05361009516 December 2005Appendix C - Fault Tree Analysis - Attachment 1 - Human Error Probabilities; Attachment 1:A - Human Error Probabilities
ML07200042826 July 2007FAQ Log, Dated 6/13/07
ML0721904619 August 2007Appeal of FAQ 69.2 - Emergency Diesel Generator Fuel Oil Line Filling Failure
ML07253061421 September 2007Public Meeting Summary on the Reactor Oversight Process
ML07296017031 October 2007Public Meeting Summary on the Reactor Oversight Process
ML09148035131 December 20082008 Radiological Monitoring Program, Annual Report Parts I and II
ML09216041313 April 20092009 Kewaunee Initial Examination Proposed Written Examination
ML0922306186 August 2009Response to Request for Additional Information for the Review of the License Renewal Application - Leak Before Break/Boral
ML09244042124 August 2009Attachment 1 - Volume 3, Kewaunee Power Station, Improved Technical Specifications Conversion, ITS Chapter 1.0, Use and Application, Revision 0
ML09244042324 August 2009Attachment 1 - Volume 5, Kewaunee Power Station, Improved Technical Specifications Conversion, ITS Section 3.0, LCO and SR Applicability, Revision 0
ML10125014626 April 20102009 Annual Environmental Monitoring Report
ML1018902111 July 2010Attachment 1, Volume 5, Revision 1, Kewaunee Power Station Improved Technical Specifications Conversion, ITS Section 3.0, LCO and SR Applicability
ML1018902151 July 2010Attachment 1, Volume 3, Revision 1, Kewaunee Power Station Improved Technical Specifications Conversion, ITS Chapter 1.0 Use and Application