Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
JAFP-13-0023, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)28 February 2013Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)High Radiation Area
Locked High Radiation Area
FLEX
Spent Fuel Pool Instrumentation
JAFP-13-0024, Entergys Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents (Order Number EA-12-050)28 February 2013Entergys Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents (Order Number EA-12-050)High winds
Ultimate heat sink
Hydrostatic
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Design basis earthquake
Hardened vent
Scaffolding
Flow Induced Vibration
Power Uprate
JAFP-13-0025, Overall Integrated Plan in Response to March 12, 2012, Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)28 February 2013Overall Integrated Plan in Response to March 12, 2012, Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)High winds
Ultimate heat sink
Time to boil
Operating Basis Earthquake
FLEX
Seismically rugged
Design basis earthquake
Containment Hardened Vent
Weak link
JAFP-14-0075, Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying License with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)30 June 2014Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying License with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)FLEX
Tornado Generated Missile
Seismically rugged
Design basis earthquake
Containment Hardened Vent
Earthquake
Scaffolding
JAFP-18-0050, Report of Full Compliance with Phase 1 & Phase 2 of 06/06/2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)28 August 2018Report of Full Compliance with Phase 1 & Phase 2 of 06/06/2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)High winds
Ultimate heat sink
Mission time
Tornado Missile
FLEX
Design basis earthquake
Spent Fuel Pool Instrumentation
Severe Accident Management Guideline
Hardened vent
Scaffolding
Weak link
ML07011034214 October 1983Indiana Bat Recovery Plan - JAFNPP SEIS Reference