Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitle
IR 05000298/20140062 September 2014Mid-Cycle Assessment Letter for Cooper Nuclear Station (Report 05000298/2014006)
IR 05000298/201500312 November 2015IR 05000298/2015003, July 1, 2015 Through September 30, 2015, Cooper Nuclear Station - NRC Integrated Report
IR 05000298/20150062 March 2016Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2015006)
IR 05000298/201600512 September 2016Errata for Mid-Cycle Assessment Letter for Cooper Nuclear Station (Report 05000298/2016005)
IR 05000298/201600717 May 2016NRC Evaluation of Changes, Tests, and Experiments and Permanent Plant Modifications Baseline Inspection Report 05000298/2016007
IR 05000298/20170061 March 2018Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2017006)
IR 05000298/20180108 May 2018Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans - Inspection Report 05000298/2018010
ML12054A67912 March 2012Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation
ML12056A04412 March 2012Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status
ML12118A54127 April 2012Joint Answer Opposing Hearing Requests Regarding Sufficiency of Order EA-12-051 Modifying Licenses with Regard to Spent Fuel Pool Instrumentation
ML13246A34829 August 2013Draft Request for Additional Information Email, Overall Integrated Plan in Response to 3/12/12 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)
ML13256A08212 September 2013Request for Additional Information Email, Overall Integrated Plan in Response to 3/12/12 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)
ML13323A1054 December 2013Interim Staff Evaluation and Request for Additional Information, Overall Integrated Plan in Response to 3/12/12 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)
ML13338A61226 March 2014G20130229 - 2.206 Petition Closure Letter Re Revoke Operating License for General Electric Mark I and Mark II Boiling Water Reactors
ML14007A65011 February 2014Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)
ML14037A16710 February 2014Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Cooper Nuclear Station, TAC No.: MF0972
ML14083A62026 March 2014Nuclear Regulatory Commission Audits of Licensee Responses to Reliable Spent Fuel Pool Instrumentation Order EA-12-051
ML14198A14127 October 2014G20110262/EDATS: OEDO-2011-0269 - Response LTR to Paul Gunter & Kevin Kamps Ltr. Re 2.206 - Immediately Suspend the Operating License of General Electric Boiling Water Reactors Mark I Units
ML14248A30810 September 2014Assignment of Project Managers within the U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation, Japan Lessons-Learned Division
ML14335A63015 January 2015G20110262 - Final Response to Paul Gunter and Kevin Kamps Letter 2.206 - Immediately Suspend the Operating License of General Electric Boiling Water Reactors Mark I Units
ML14337A24315 January 2015G20110262 - Final Director'S Decision - Paul Gunter and Kevin Kamps Letter 2.206 - Immediately Suspend the Operating License of General Electric Boiling Water Reactors Mark I Units
ML15063A5464 March 2015Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2014001)
ML15251A24027 August 2015Nebraska Public Power District'S Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
ML16083A5257 March 2016Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051
ML16217A47529 August 2016Report for the Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051
ML16242A32931 August 2016Mid-Cycle Assessment Letter for Cooper Nuclear Station (Report 05000298/2016005)
ML17226A03220 September 2017Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051
ML18023A11023 January 2018CNS - Notification of NRC Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans (05000298/2018010) and Request
ML19079A0707 May 2019Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC No. MF4384; EPID No. L-2014-JLD-0046)
ML20290A40521 October 2020Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-Ichi Accident
ML21040A30029 March 2021Issuance of Amendment No. 269 to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors
NLS2012026, Answer to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)30 March 2012Answer to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
NLS2012111, Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA- 12-051)26 October 2012Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA- 12-051)
NLS2013026, Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA- 12-051)28 February 2013Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA- 12-051)
NLS2013078, Nebraska Public Power District'S First Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)27 August 2013Nebraska Public Power District'S First Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
NLS2013091, Response to Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)14 October 2013Response to Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)
NLS2014018, Nebraska Public Power District'S Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)26 February 2014Nebraska Public Power District'S Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
NLS2014057, Phase 1 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order No. EA-13-109)30 June 2014Phase 1 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order No. EA-13-109)
NLS2014081, Third Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)26 August 2014Third Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
NLS2014101, First Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-13-109)19 December 2014First Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-13-109)
NLS2015020, Nebraska Public Power District'S Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Cooper Nuclear Station23 February 2015Nebraska Public Power District'S Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Cooper Nuclear Station
NLS2015101, Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)27 August 2015Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
NLS2015137, Phase 1 and Phase 2 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)21 December 2015Phase 1 and Phase 2 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)
NLS2016006, Sixth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)16 February 2016Sixth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
NLS2016045, Nebraska, Final Six-Month Status Report and Response to Request for Additional Information in Response to Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)22 August 2016Nebraska, Final Six-Month Status Report and Response to Request for Additional Information in Response to Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
NLS2016066, Completion of Required Action by NRC Order EA-12-051 - Reliable Spent Fuel Pool Instrumentation20 December 2016Completion of Required Action by NRC Order EA-12-051 - Reliable Spent Fuel Pool Instrumentation
NLS2016070, Completion of Required Action by NRC Order EA-12-049 - Mitigation Strategies for Beyond-Design-Basis External Events4 January 2017Completion of Required Action by NRC Order EA-12-049 - Mitigation Strategies for Beyond-Design-Basis External Events
NRC-2012-0067, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status12 March 2012Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status