Issue date | Title | From | To | |
---|---|---|---|---|
CPSES-200201911, Letter from Roger D. Walker Re Comanche Peak Steam Electric Station Completion of Generic Letter 95-07 Activities for Unit 2 | 1 May 2002 | Letter from Roger D. Walker Re Comanche Peak Steam Electric Station Completion of Generic Letter 95-07 Activities for Unit 2 | Walker R TXU Energy | Office of Nuclear Reactor Regulation Document Control Desk |
CPSES-200203913, Completion of Generic Letter 95-07 Activities for Unit 1 | 4 December 2002 | Completion of Generic Letter 95-07 Activities for Unit 1 | Walker R TXU Energy | Office of Nuclear Reactor Regulation Document Control Desk |
IR 05000445/1999003 | 7 April 1999 | Insp Repts 50-445/99-03 & 50-446/99-03 on 990124-0306.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) | |
IR 05000445/1999014 | 14 September 1999 | Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Operations,Maint,Engineering & Plant Support | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) | |
Information Notice 1996-05, Partial Bypass of Shutdown Cooling Flow from Reactor Vessel | 18 January 1996 | Partial Bypass of Shutdown Cooling Flow from Reactor Vessel | Crutchfield D Office of Nuclear Reactor Regulation | |
Information Notice 1996-08, Thermally Induced Pressure Locking of a High Pressure Coolant Injection Gate Valve | 5 February 1996 | Thermally Induced Pressure Locking of a High Pressure Coolant Injection Gate Valve | Crutchfield D Office of Nuclear Reactor Regulation | |
Information Notice 1996-49, Thermally Induced Pressurization of Nuclear Power Facility Piping | 20 August 1996 | Thermally Induced Pressurization of Nuclear Power Facility Piping | Martin T Office of Nuclear Reactor Regulation | |
Information Notice 1997-07, Problems Identified During Generic Letter 89-10 Closeout Inspections | 6 March 1997 | Problems Identified During Generic Letter 89-10 Closeout Inspections | Martin T Office of Nuclear Reactor Regulation | |
ML072490310 | 31 August 2007 | WCAP-16840-NP, Rev. 0, Comanche Peak Nuclear Power Plant Stretch Power Uprate Licensing Report, Cover to Page 2.7.7-5 | Westinghouse | Office of Nuclear Reactor Regulation |
ML081510173 | 27 June 2008 | Issuance of Amendment Nos. 146 and 146, Stretch Power Uprate, Revision to TS 1.0, Use and Application, to Revise Rated Thermal Power from 3458 to 3612 Mwt | Balwant Singal NRC/NRR/ADRO/DORL/LPLIV | Luminant Blevins M |
ML20093K780 | 16 October 1995 | Responds to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves | Luminant Terry C | Office of Information Resources Management |
ML20094H270 | 6 November 1995 | Provides Listed Clarification Re 90 Day Requested Actions Stated in GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves | Luminant Terry C | Office of Information Resources Management |
ML20100F269 | 13 February 1996 | Forwards Rev 0 of Engineering Rept ER-ME-102, Resolution of NRC GL 95-07 'Pressure Locking & Thermal Binding of Safety- Related Power-Operated Gate Valves.' | Luminant Terry C Kelley J | Office of Information Resources Management |
ML20100F276 | 13 February 1996 | Rev 0 of Engineering Rept, Resolution of NRC GL 95-07 'Pressure Locking & Thermal Binding of Safety-Related Power- Operated Gate Valves.' | Luminant Meyer J Brau J Chiu P | |
ML20116A014 | 18 July 1996 | Responds to RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power Operated Gate Valves | Luminant Terry C | Office of Information Resources Management |
ML20137C268 | 14 March 1997 | Responds to GL 95-07, Pressure Locking & Thermal Binding of SR Power Operated Gate Valves | Luminant Walker R Terry C | Office of Information Resources Management |
ML20154B574 | 30 September 1998 | Safety Evaluation Re Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Motor-Operated Valves. Licensee Has Established Acceptable Program | NRC (Affiliation Not Assigned) | |
ML20195B635 | 25 May 1999 | Submits Response to RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves | Luminant Walker R Terry R | Office of Information Resources Management |
ML20195J065 | 14 June 1999 | Submits Response to RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves | Luminant Walker R Terry C | Office of Information Resources Management |
ML20209H750 | 15 July 1999 | Forwards Safety Evaluation on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 | NRC (Affiliation Not Assigned) Jaffe D | Terry C TEXAS UTILITIES CO. |
ML20209H766 | 15 July 1999 | Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 | NRC (Affiliation Not Assigned) | |
NRC Generic Letter 1995-07 | 17 August 1995 | NRC Generic Letter 1995-007: Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves | Crutchfield D Office of Nuclear Reactor Regulation |