Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IR 05000461/200201024 January 2003Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-UW_04, NRC, Clinton Power Station NRC Inspection Report 50-461/02-10(DRS) (January 24, 2003)Commercial Grade Dedication
Temporary Modification
Significance Determination Process
ML05038017131 December 2004R. Nevin Staff Exhibit 8, Nirs/Pc EC-7: Exelon Corporation, Power Generation, 2004, Available at Http://Www.Exeloncorp.Com/Generation/Nuclear/Gn Nuclear.Shtml
ML08253030612 August 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-13-UY, INPO Report OE-17412 (Clinton)
ML08253030812 August 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-15-VY, INPO Report OE-20246 (Clinton)
ML08253030912 August 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-16-VY, INPO Report OE-17654 (Clinton)Through-Wall Leak
ML08253047023 July 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-14-VY, INPO Report OE-18478 (Clinton)