Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Start dateTitleInspection procedureNumber of inspectorsTopic
50.59 Inspection (Arkansas Nuclear 2019)18 November 201950.59IP 71111.17T, Evaluations of Changes, Tests, and Experiments3
Access Authorization Inspection (Arkansas Nuclear 2021)8 March 2021Access AuthorizationIP 71130.01, Access Authorization
IP 71130.02, Access Control
2
Access Control Inspection (Arkansas Nuclear 2019)2 September 2019Access ControlIP 71130.02, Access Control1
Access Control Inspection (Arkansas Nuclear 2020)11 May 2020Access ControlIP 71130.02, Access Control1
DBAI Inspection (Arkansas Nuclear 2020)8 June 2020DBAIIP 71111.21N.023
DBAI Program Inspection (Arkansas Nuclear 2021)14 June 2021DBAI ProgramIP 71111.21M, Design Bases Assurance Inspection6
EP Exercise Evaluation Inspection (Arkansas Nuclear 2020)14 September 2020EP Exercise EvaluationIP 71114.014
EP Program Inspection (Arkansas Nuclear 2019)25 August 2019EP ProgramIP 71114.03
IP 71114.02
IP 71114.05
1
Inservice Inspection (Arkansas Nuclear 2019)15 October 2019InserviceIP 71111.08P1
Inservice Inspection (Arkansas Nuclear 2020)23 March 2020InserviceIP 71111.08P1
Inservice Inspection (Arkansas Nuclear 2021)12 April 2021InserviceIP 71111.08P1
Licensed Operator Requalification Program Inspection (Arkansas Nuclear 2019)7 July 2019Licensed Operator Requalification ProgramIP 71111.11B2
Licensed Operator Requalification Program Inspection (Arkansas Nuclear 2020)5 July 2020Licensed Operator Requalification ProgramIP 71111.11B2
Material Control & Accounting Inspection (Arkansas Nuclear 2020)15 June 2020Material Control & AccountingIP 71130.111
NOV Followup Inspection (Arkansas Nuclear 2019)1 December 2019NOV FollowupIP 92702 CONF2
PI&R Inspection (Arkansas Nuclear 2019)5 August 2019PI&RIP 71152, Problem Identification and Resolution (PI&R)4
Radiation Monitoring Instrumentation Inspection (Arkansas Nuclear 2020)15 June 2020Radiation Monitoring InstrumentationIP 71124.08
IP 71124.05
IP 71124.06, Radioactive Gaseous and Liquid Effluent Treatment
IP 71124.07, Radiological Environmental Monitoring Program
4
Radiation Safety Inspection (Arkansas Nuclear 2019)21 October 2019Radiation SafetyIP 71124.03
IP 71124.01, Radiological Hazard Assessment and Exposure Controls
2
Radiation Safety Inspection (Arkansas Nuclear 2020)23 March 2020Radiation SafetyIP 71124.02
IP 71124.01, Radiological Hazard Assessment and Exposure Controls
2
Radiation Safety Inspection (Arkansas Nuclear 2021)19 April 2021Radiation SafetyIP 71124.03
IP 71124.01, Radiological Hazard Assessment and Exposure Controls
2
Security Equipment Inspection (Arkansas Nuclear 2020)5 October 2020Security EquipmentIP 71130.04, Security Equipment
IP 71130.07, Security Training
2
Validation of Initial License Examination Inspection (Arkansas Nuclear 2020)1 March 2020Validation of Initial License ExaminationEXAD
OV
7
Validation of Initial License Examination Inspection (Arkansas Nuclear 2021)28 February 2021Validation of Initial License ExaminationEXAD
OV
7