Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleSiteProject stage
ML16238A1333 January 2018Dennis MoreyLetter on Draft SE for MRP-227 Action Items 1 and 7Electric Power Research InstituteDraft Approval
ML18016A00829 January 2018Dennis MoreyFinal Safety Evaluation of Action Items 1 and 7 from Topical Report MRP-227-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluations GuidelineElectric Power Research InstituteApproval
ML18142A22924 April 2018
27 April 2018
17 May 2018
Electric Power Research Institute Transmittal of Supplemental Information Regarding Technical Report MRP-227, Revision 7, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines.Request
ML18176A18812 July 2018Joseph Holonich
Research and Test Reactors Oversight Projects Branch
Operating Experience Request for Additional Information for Electric Power Research Institute Topical Report MRP-227, Revision 1 (CAC No. MF7223; EPID L-2016-TOP-0001)Electric Power Research InstituteRAI
ML18275A06928 February 2019Dennis MoreyMRP-227 Rev 1 Draft SE Transmittal LetterElectric Power Research InstituteDraft Approval
ML19081A00125 April 2019Dennis Morey
Licensing Processes Branch
Final Safety Evaluation for Electric Power Research Institute Topical Report MRP-227, Revision 1, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluations GuidelineElectric Power Research InstituteApproval