Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
ML20151U6888 September 1998Hall J
NRC (Affiliation Not Assigned)
Forwards Request for Addl Info Re Unresolved Safety Issue A-46, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors, in Response to Util 960613 Submittal of Summary ReptRAI
ML20154F8377 October 1998NRC (Affiliation Not Assigned)
Wigginton D
Forwards Request for Addl Info Related to Unresolved Safety Issue A-46, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors, for Plant. Response Requested within 90 Days of Receipt of LtrRAI
ML20198E09525 November 1992Office of Nuclear Reactor Regulation
Rood H
Forwards Safety Evaluation Accepting 920921 120-day Response to Suppl 1 to GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46Approval
ML20198E10925 November 1992Office of Nuclear Reactor RegulationSafety Evaluation Accepting Licensee 920921 120-day Response to GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46Approval
ML20212K96630 September 1999NRC (Affiliation Not Assigned)
Lawrence Burkhart
Forwards Safety Evaluation Accepting plant-specific Safety Evaluation Rept for USI A-46 Program Implementation at Cooper Nuclear StationApproval