Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
ML20209A85327 January 1987Southern Nuclear
Gucwa L
Requests Expedited Issuance of 861120 Proposed Tech Spec Revs to Snubber Operability Criteria to Avoid Unnecessary Unit Shutdown,Per 10CFR50.91(a)(5)Other
ML20209B50329 January 1987Southern Nuclear
Gucwa L
Corrects Certain Info Submitted in 870127 Request for Expedited Issuance of Tech Spec Changes Re Snubber Operability Criteria.Snubber Insp Outage Actually Commenced on 861114 & Unit Returned to Svc on 861121Request
ML20214S24320 November 1986Southern Nuclear
James O'Reilly
Application for Amends to Licenses NPF-5 & DPR-57,revising Tech Specs 4.6.L.2 for Unit 1 & 4.7.4.b for Unit 2,to Determine Operability of Hydraulic Snubbers on Loss of Fluid.Fee PaidRequest
ML20214S29520 November 1986Southern NuclearProposed Tech Specs Re Operability of Hydraulic Snubbers on Loss of FluidOther