Semantic search
Jump to navigation
Jump to search
Issue date | From | Title | Project stage | |
---|---|---|---|---|
ML20062G381 | 18 December 1978 | NORTHEAST UTILITIES Counsil W | Forwards non-proprietary Version of Sleeved CEA Guide Tube Inspec Prog,CEN-104(N)-NP,relating to Amend 38 to DPR-65. IAW 10CFR2.790.W/encl Affidavit | Other |
ML20062G387 | 14 December 1978 | NORTHEAST UTILITIES | Sleeved Guide Tube Inspec Prog, CEN-104(N)-NP.Describes Inspec Prog to Show Performance Re Wear.Edited to Delete Info W/Held from Pub Disclosure IAW 10CFR2.790 | Other |
ML20064C234 | 11 October 1978 | NORTHEAST UTILITIES Counsil W | Forwards Proposed Tech Specs to Require Diesel Generator Start Time of Less than or Equal to 20 | Other |
ML20064D492 | 1 November 1978 | NORTHEAST UTILITIES Counsil W | Presents Details of Stretch Power Effort in Advance of Execution to Enable Facility to Operate at 2,700 Mwt Following Second Refueling Outage | Other |
ML20064E453 | 18 November 1978 | Nebraska Public Power District Counsil W | Forwards Sys Description for Reactor Coolant Pump Shaft Speed Trip Function Being Installed by Util to Replace Steam Generator Differential Pressure Sys.Believes Proposal Is Exempt from Amend Fee | Other |
ML20064H429 | 15 December 1978 | NORTHEAST UTILITIES Counsil W | Appl to Amend Oper Lic DPR-65 by Increasing Maximum Allowable Thermal Output of Subj Facil Over 2700MWt to Commence W/Cycle 3 on 790515.W/att Environ Impact Appraisal, Eval of Radiological Consequences & Site Meteorology | Other |
ML20076A802 | 6 April 1979 | NORTHEAST UTILITIES Counsil W | in Answer to IE Bulletin 79-01,environmentally Qualified stem-mounted Limit Switches W/Appropriate Documentation Can Be Procured.Util Will Replace Switches W/Qualified Switches Prior to Start of Cycle 3 Operation Scheduled for May 1979 | Other |
ML20076A836 | 13 April 1979 | NORTHEAST UTILITIES Counsil W | Eddy Current Test Has Been Performed.No Tube Defects Discovered & No Corrective Action Based on Tube Defects Required.Preliminary Analysis of Results of Insp Indicates Denting Rate Has Been Reduced | Other |
ML20076A843 | 13 April 1979 | NORTHEAST UTILITIES | Steam Generator Insp | Other |
ML20076A904 | 18 April 1979 | NORTHEAST UTILITIES Counsil W | Responds to IE Bulletin 79-01.One Solenoid Installed on safety-related Valve in Plant Containment Has Not Been Qualified for Svc in LOCA Environ.Solenoid Will Be Replaced Before Start of Cycle 3 Operation | Other |
ML20076A952 | 26 April 1979 | NORTHEAST UTILITIES Counsil W | Discusses Guide Tube Insp Program.Pull Tests Performed on 35 Sleeves.Evaluation of Data Indicates Sleeves Are Functioning as Expected | Other |
ML20076A955 | 26 April 1979 | NORTHEAST UTILITIES Counsil W | Responds to NRC 780419 Request for Insulation Resistance Tests.Forwards Electrical Penetration Testing Evaluation. Modified Conductor Configuration Is Acceptable for Cycle 3 Operation | Request |
ML20076B087 | 8 May 1979 | NORTHEAST UTILITIES Counsil W Switzer D | Notifies That stem-mounted Limit Switches on Valves SI-614, SI-624,SI-634 & SI-644 Will Not Be Replaced;Valves Do Not Perform safety-related Function | Other |
ML20076B088 | 11 May 1979 | NORTHEAST UTILITIES Counsil W Switzer D | Discusses Results of Six Tasks Which Utilized Adlpipe Computer Program for Reanalysis of Piping Sys.Mods Involved Minor Changes to Small Portions of Existing Sys | Other |
ML20076B089 | 17 May 1979 | NORTHEAST UTILITIES Counsil W | Forwards Addl Info Re Performance of Control Element Assembly Guide Tubed Sleeves,In Response to | Other |
ML20236C304 | 14 September 1976 | Jaffe D Office of Nuclear Reactor Regulation | Notification of 760928 Meeting W/Util in Bethesda,Md to Discuss Util Concepts for Proposed Neutron Shield for Plant. Summary of Neutron Streaming Problem Encl | Meeting |
ML20244A548 | 23 March 1979 | NORTHEAST UTILITIES Counsil W | Provides Trip Setpoint for Proposed Tech Spec Revision to Incorporate Reactor Coolant Pump Speed Sensing Sys as Addition to Reactor Protection Sys | Other |
ML20244A585 | 12 April 1979 | Counsil W Northeast Nuclear Energy | Forwards Info Re Proposed Revisions to Tech Specs to Reflect Installation of Reactor Coolant Pump Speed Sensing Sys to Provide Protection for 4-pump Loss of Flow Event | Other |
ML20244A613 | 3 May 1979 | NORTHEAST UTILITIES Counsil W | Forwards Responses to Request for Addl Info Re Cycle 3 Safety Analysis.Nonproprietary Rept Encl.Proprietary Version Withheld (Ref 10CFR2.790) | Request |