Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Start dateReporting criterionTitleEvent descriptionSystemLER
ENS 412392 December 2004 23:30:0010 CFR 50.72(b)(2)(i), Tech Spec Required ShutdownTechnical Specification Shutdown Due to Loss of the Division 2 125 Vdc Battery ChargerOn December 2, 2004, at 17:30 p.m. CST, River Bend Station commenced a plant shutdown required by Technical Specifications. This action was made necessary by the loss of the Division 2 safety-related 125 volt battery charger. The cause of the failure has not been determined. Actions are ongoing to restore the charger to service. The pertinent Technical Specification action statement was entered at 1236 CST on 12/02/2004, and requires the plant to be in Mode 3 by 0036 CST on 12/03/2004 and Mode 4 by 0036 CST on 12/04/2004. This event is being report in accordance with 10CFR50.72(b)(2)(i). The licensee added that the Division 1 electrical system is available and fully capable of supporting all reactor safety-related protective functions. The licensee is still trouble shooting the cause of the charger malfunction. The licensee has notified the NRC Senior Resident Inspector.