Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML18082A492 | 12 May 1980 | Forwards Schedule for Evaluation of Westinghouse Steam Generator Row One U Bends.Requests Delay of NRC Issuance of Generic Ltrs to near-term OL Plants Requiring Plugging of Row One Tubes,In Confirmation of 800415 Meeting | Non-Destructive Examination Eddy Current Testing |
ML20055A344 | 1 July 1982 | Forwards Conservative Calculation of Enthalpy Rise Factor W/Power Level & Tech Specs Limits | |
ML20148A533 | 3 March 1988 | Requests That Proprietary WCAP-11699 Be Withheld from Public Disclosure,Per 10CFR2.790.Affidavit Encl | Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Intergranular Stress Corrosion Cracking Stress corrosion cracking Pressure Boundary Leakage Affidavit Water hammer |
ML20209E062 | 1 August 1986 | FOIA Request for Documents Re Installation,Usage & Possible Failure of Compression Tube Fittings at Plant from Jan 1984 to Present | |
ML20211P058 | 18 February 1987 | Requests That Rev 1 to WCAP-11307, Tubesheet Region Plugging Criteria for Portland General Electric,Trojan Nuclear Station,Class 2, Be Withheld from Public Disclosure (Ref 10CFR2.790) | Affidavit |
ML20214P895 | 14 May 1987 | Requests Summary of 870408 Meeting Between NRC & Util,Per Attached Notice | |
ML20245H534 | 31 January 1989 | Requests That Proprietary WCAP-12029, Trojan Nuclear Plant Reactor Vessel Vertical Support Loads Be Withheld (Ref 10CFR2.790) |