Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
CNL-18-059, Submittal of Revised Site Safety Analysis Report Subsection 2.4.2.2, Flood Design Considerations, and Subsection 2.4.3.5, Probable Maximum Flood Flow, and Figure 2.4.3-3 in Support of Early Site Permit Application for Clinch River Nuclear | 27 April 2018 | Submittal of Revised Site Safety Analysis Report Subsection 2.4.2.2, Flood Design Considerations, and Subsection 2.4.3.5, Probable Maximum Flood Flow, and Figure 2.4.3-3 in Support of Early Site Permit Application for Clinch River Nuclear S | |
ML18054A441 | 31 May 1995 | K-25 Site, Oak Ridge Reservation, Oak Ridge, Tennessee, K-25 Cultural Resources Survey; May 1995 (Redacted) | Coatings |
ML18054A475 | 31 October 1974 | Archaeological Survey with Emphasis on Prehistoric Sites of the Oak Ridge Reservation, Oak Ridge, Tennessee; October 1974 (Redacted) | |
ML18064A893 | 31 January 1985 | the Clinch River Breeder Reactor Plant Project Final Report Breeder Reactor Corporation | |
ML18064A894 | 18 September 2013 | DOE Oak Ridge Groundwater Strategy 2013 | |
ML18220A777 | 8 August 2018 | Summary from Staff'S Examination of Geologic Features at Tva'S Clinch River Nuclear Site During a 30-31 January 2018 NRC Management Site Visit | |
ML18318A099 | 31 August 2003 | Conservation Assessment for Appalachian Bugbane | |
ML19037A270 | 30 September 2016 | State of Tenn General NPDES Permit for Discharges of Stormwater Associated with Construction Activities (Permit No. TNR100000) |