Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML15253A48528 August 2015USGS - Response to RAI Dated August 18, 2015, Regarding R-113 License Amendment Request
ML15323A31617 November 2015U.S. Geological Survey - Response to RAI Dated September 21, 2015, Regarding R-113 License Amendment Request
ML16042A57522 January 2016U.S. Geological Survey - Responses to RAI Questions La, Lb, and Lc
ML16110A0081 April 2016U.S. Dept. of the Interior, Geological Survey, Response to NRC Staff Request for Additional Information for License Renewal Review April 1, 2016Shutdown Margin
Earthquake
Fuel cladding
ML16216A1431 August 2016Us Dept of Interior, Geological Survey (Usgs), Responses to Request for Additional Information on PSP Questions Raised During a Teleconference on 07/21/2016
ML16221A38928 July 2016Us Department of the Interior Geological Survey Request for Additional Response Time for RAI Clarifications
ML16273A30422 September 2016Us Department of the Interior, Geological Survey, Responses to E-Mail QuestionsShutdown Margin
Fuel cladding
ML16277A21612 September 2016USGS Response to Request for Additional Information Dated 06/28/2016Shutdown Margin
Fuel cladding
ML20336A0201 December 2020U.S. Geological Survey Triga Reactor - License Amendment Request LAR 14, Supplemental Information Letter 04 Provided in Response to Phone Call with NRC Project Manager at 0854 Mst on 2020-11-30