Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML17258A61031 January 1982SEP Topic VI-4,Electrical,Instrumentation & Control Aspects of Override of Containment Purge Valve Isolation,Re Ginna Nuclear Power Plant, Informal Rept
ML19289C91019 December 1978Interim Rept Re Fire Protection in Operating Nuclear Power Stations. Provides an Exception to Proposed Fire Protection in Ser.Discusses Valve Supervision,Cable Protection & Review Documents.Proposed Mods AcceptableFire Protection Program
ML20027D76915 July 1982Investigation of Failed Tubes from B Steam Generator of Re Ginna Nuclear Power Plant, SER App
ML20039A45230 November 1981Adequacy of Station Electric Distribution Sys Voltages, Palisades Plant, Informal Rept
ML20039A55530 November 1981Electrical,Instrumentation & Control Sys Support for SEP, SEP Topic V-11.A,electrical,instrumentation & Control Features for Isolation of High & Low Pressure SysPower-Operated Valves
ML20039A68430 November 1981SEP Topic VI-7.C.1,Independence of Redundant Onsite Power Sys,Re Ginna Nuclear Station, Informal Rept
ML20039A68830 November 1981to SEP Topic VIII-4,Electric Penetrations of Reactor Containment,Re Ginna Nuclear Station, Informal Rept
ML20039G50131 December 1981SEP Topic VII-2,ESF Sys Control Logic & Design,Ginna Nuclear Power Plant 1.Safe Shutdown