Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
05000387/LER-1982-016, Reissued LER 82-016/01T-1:on 820920,mechanical Vacuum Pump Left in Svc After Ventilation Monitoring Sys Noble Gas Monitor Became Inoperable on 820918.Caused by Operator Not Noting All Parts of Applicable Action Statements11 October 1982Reissued LER 82-016/01T-1:on 820920,mechanical Vacuum Pump Left in Svc After Ventilation Monitoring Sys Noble Gas Monitor Became Inoperable on 820918.Caused by Operator Not Noting All Parts of Applicable Action Statements
05000387/LER-1983-066, Updated LER 83-066/03X-1:on 830414,during Mod to Remove Check Valve,Valve Disk Found Lodged in Pipe & Various Small Valve Parts Missing.Caused by Extensive Sys run-time During Resolution of ESW Waterhammer problem.W/840307 Ltr7 March 1984Updated LER 83-066/03X-1:on 830414,during Mod to Remove Check Valve,Valve Disk Found Lodged in Pipe & Various Small Valve Parts Missing.Caused by Extensive Sys run-time During Resolution of ESW Waterhammer problem.W/840307 LtrHydrostatic
05000387/LER-1983-153, Updated LER 83-153/03X-1:on 831102,fuse Supplying Power to Topaz Inverter Blew,Deenergizing RCIC Instruments at Remote Shutdown Panel.Cause Not Stated.Fuse Replaced. W/840320 Ltr20 March 1984Updated LER 83-153/03X-1:on 831102,fuse Supplying Power to Topaz Inverter Blew,Deenergizing RCIC Instruments at Remote Shutdown Panel.Cause Not Stated.Fuse Replaced. W/840320 Ltr
05000387/LER-1984-001, Updated LER 84-001-01:on 840103,H2/O2 Analyzers in Containment Atmosphere Monitoring Sys Declared Inoperable Based on Vendor Info.Caused by Catalyst Inability to Withstand Iodine Concentrations9 April 1984Updated LER 84-001-01:on 840103,H2/O2 Analyzers in Containment Atmosphere Monitoring Sys Declared Inoperable Based on Vendor Info.Caused by Catalyst Inability to Withstand Iodine Concentrations
05000387/LER-1984-012, Revised LER 84-012-01:on 840225,due Date & Violation Date Inadvertently Omitted from Cover Sheet of Quarterly Surveillance Procedure SI-072-301.Administrative Procedures Revised14 June 1984Revised LER 84-012-01:on 840225,due Date & Violation Date Inadvertently Omitted from Cover Sheet of Quarterly Surveillance Procedure SI-072-301.Administrative Procedures RevisedMissed surveillance
05000387/LER-1984-017, Updated LER 84-017-01:on 840310,during Performance of Weekly Preventive Maint Activity,Spray Pond Riser Networks A-1 & B-2 Found Frozen.W/Advent of Mild Weather,Networks Thawed & Pumped down.Long-term Fixes Investigated6 June 1984Updated LER 84-017-01:on 840310,during Performance of Weekly Preventive Maint Activity,Spray Pond Riser Networks A-1 & B-2 Found Frozen.W/Advent of Mild Weather,Networks Thawed & Pumped down.Long-term Fixes Investigated
05000388/LER-1984-013, Attachments to LER 84-013-0013 September 1984Attachments to LER 84-013-00