Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML06096050217 March 2006Figure 2.5-25 Geologic Section H-H Braidwood Station Updated Final Safety Analysis Report
ML06096050417 March 2006Drawing Showing Braidwood Station, Essex Road, Blowdown Structure at Rive Screen House and 11 Ocw Numbered Items
ML06096051217 March 2006Figure 1 Site Plan and Well Locations Braidwood Station
ML0609606019 June 2005Draft Proposed Staff Gauge and Monitoring Well Location
ML0609700651 December 2005Figure 2, Tritium in Groundwater and Surface Water, Braidwood Station
ML0609701052 December 2005Figure 6, Recent Sample Results
ML06097013930 November 2005NRC Email from Richard Skokowski to Steven Orth Fwd: CRs Tritium Leak Vacuum Breakers
ML0609706006 December 2005Drawing M-33, Diagram of Circulation Water Make-up Unit 1 and 2.
ML0609706026 December 2005Figure Estimated Tritium Concentrations December 6, 2005, Braidwood Station
ML0609706036 December 2005Figure Estimated Tritium Concentration December 6, 2005, Braidwood Station
ML0609706056 December 2005Figure Estimated Tritium Concentrations December 6, 2005, Braidwood Station
ML0609706066 December 2005Draft - Figure Version 2 Select Locations - Hand Contours December 6, 2005 Braidwood Station
ML06101067616 December 2005Potential Source Release and Transport Theories
ML06101068816 December 2005Tritium Concentrations in the Deeper Monitoring Wells
ML06101069416 December 2005Schematic of Regional Hydrogeology
ML06102042831 January 2006Drawing Figure 2, Draft Average Groundwater Contours Shallow - January 2006.
ML06107052630 January 2006Drawing 6, Site Specific Hydrogeologic Profile January 2006 (A-A')
ML06107052930 January 2006Drawing 1, Groundwater Monitoring Locations.
ML0617100103 December 2005Figure 10, Sample Results Off Property Locations as of 12 Braidwood Station
ML0617102753 December 2005Multiple Maps and Drawings: Offsite Sample Results
ML0618400598 December 2005E-mail from Orth to Braidwood Communication Team, Braidwood Tritium - Recent Contamination Contours, Etc
ML0618400699 December 2005E-mail from Habighorst to Lynch, Braidwood Tritium - Recent Contamination Contours, Etc
ML06184008630 January 2006Figure 5 - Estimated Tritium Results Deep Groundwater Zone - Braidwood Station
ML06184008730 January 2006Figure 4 - Estimated Tritium Results Shallow Groundwater Zone - Braidwood Station
ML0618401171 December 2005E-mail from Shah to Chawla, Cw Blowdown Sys Req
ML0618401201 December 2005E-mail from Roach to Chawla
ML0618401972 December 2005E-mail from Raghavan to Chawla, Braidwood Tritium
ML10173020728 November 2005Drawing - Figure 3, Tritium in Groundwater, November 2005, Braidwood Station
ML1017302113 December 2005Drawing - Offsite Sample Results as of 12/3/05
ML15055A39015 December 2014Byron/Braidwood Nuclear Stations, Updated Final Safety Analysis Report (Ufsar), Revision 15, Chapter 2.0 Figures - Braidwood - Part 2 of 2
ML17255A8491 September 2017Braidwood and Byron, Units 1 and 2 - Figures 600 - 649, Part 10 of 15
ML17255A8501 September 2017Braidwood and Byron, Units 1 and 2 - Figures 650 - 699, Part 11 of 15
ML17255A8511 September 2017Braidwood and Byron, Units 1 and 2 - Figures 700 - 749, Part 12 of 15
ML17255A8521 September 2017Braidwood and Byron, Units 1 and 2 - Figures 750 - 799, Part 13 of 15
ML17255A8531 September 2017Braidwood and Byron, Units 1 and 2 - Figures 800 - 849, Part 14 of 15
ML17255A8541 September 2017Braidwood and Byron, Units 1 and 2 - Figures 850 - 904, Part 15 of 15
ML17255A8551 September 2017Braidwood and Byron, Units 1 and 2 - Figures 151 - 200, Part 1 of 15
ML17255A8571 September 2017Braidwood and Byron, Units 1 and 2 - Figures 201 - 250, Part 2 of 15
ML17255A8591 September 2017Braidwood and Byron, Units 1 and 2 - Figures 251 - 300, Part 3 of 15
ML17255A8611 September 2017Braidwood and Byron, Units 1 and 2 - Figures 301 - 350, Part 4 of 15
ML17255A8631 September 2017Braidwood and Byron, Units 1 and 2 - Figures 301 - 350, Part 5 of 15
ML17255A8641 September 2017Braidwood and Byron, Units 1 and 2 - Figures 401 - 450, Part 6 of 15
ML17255A8651 September 2017Braidwood and Byron, Units 1 and 2 - Figures 451 - 499, Part 7 of 15
ML17255A8661 September 2017Braidwood and Byron, Units 1 and 2 - Figures 500 - 549, Part 8 of 15
ML21137A20717 May 2021Byron/Braidwood Stations - Amendment 29 to Fire Protection Report, Chapter 2.3, Figures, Part 1 of 2-Redacted
RS-14-338, Byron/Braidwood Nuclear Stations, Updated Final Safety Analysis Report (Ufsar), Revision 15, Chapter 2.0 Figures - Braidwood - Part 2 of 215 December 2014Byron/Braidwood Nuclear Stations, Updated Final Safety Analysis Report (Ufsar), Revision 15, Chapter 2.0 Figures - Braidwood - Part 2 of 2
RS-17-119, Braidwood and Byron, Units 1 and 2 - Figures 151 - 200, Part 1 of 151 September 2017Braidwood and Byron, Units 1 and 2 - Figures 151 - 200, Part 1 of 15
RS-17-119, Braidwood and Byron, Units 1 and 2 - Figures 201 - 250, Part 2 of 151 September 2017Braidwood and Byron, Units 1 and 2 - Figures 201 - 250, Part 2 of 15
RS-17-119, Braidwood and Byron, Units 1 and 2 - Figures 251 - 300, Part 3 of 151 September 2017Braidwood and Byron, Units 1 and 2 - Figures 251 - 300, Part 3 of 15
RS-17-119, Braidwood and Byron, Units 1 and 2 - Figures 301 - 350, Part 4 of 151 September 2017Braidwood and Byron, Units 1 and 2 - Figures 301 - 350, Part 4 of 15