ML061010694
From kanterella
Jump to navigation
Jump to search
ML061010694 | |
Person / Time | |
---|---|
Site: | Braidwood ![]() |
Issue date: | 12/16/2005 |
From: | - No Known Affiliation |
To: | Office of Nuclear Reactor Regulation |
References | |
FOIA/PA-2006-0115 | |
Download: ML061010694 (1) | |
Similar Documents at Braidwood | |
---|---|
Category:Drawing
MONTHYEARML21137A2072021-05-17017 May 2021
[Table view]Byron/Braidwood Stations - Amendment 29 to Fire Protection Report, Chapter 2.3, Figures, Part 1 of 2-Redacted ML17255A8512017-09-0101 September 2017 Units 1 and 2 - Figures 700 - 749, Part 12 of 15 RS-17-119, Braidwood and Byron, Units 1 and 2 - Figures 600 - 649, Part 10 of 152017-09-0101 September 2017 Braidwood and Byron, Units 1 and 2 - Figures 600 - 649, Part 10 of 15 RS-17-119, Braidwood and Byron, Units 1 and 2 - Figures 650 - 699, Part 11 of 152017-09-0101 September 2017 Braidwood and Byron, Units 1 and 2 - Figures 650 - 699, Part 11 of 15 RS-17-119, Braidwood and Byron, Units 1 and 2 - Figures 700 - 749, Part 12 of 152017-09-0101 September 2017 Braidwood and Byron, Units 1 and 2 - Figures 700 - 749, Part 12 of 15 RS-17-119, Braidwood and Byron, Units 1 and 2 - Figures 750 - 799, Part 13 of 152017-09-0101 September 2017 Braidwood and Byron, Units 1 and 2 - Figures 750 - 799, Part 13 of 15 RS-17-119, Braidwood and Byron, Units 1 and 2 - Figures 800 - 849, Part 14 of 152017-09-0101 September 2017 Braidwood and Byron, Units 1 and 2 - Figures 800 - 849, Part 14 of 15 RS-17-119, Braidwood and Byron, Units 1 and 2 - Figures 850 - 904, Part 15 of 152017-09-0101 September 2017 Braidwood and Byron, Units 1 and 2 - Figures 850 - 904, Part 15 of 15 RS-17-119, Braidwood and Byron, Units 1 and 2 - Figures 151 - 200, Part 1 of 152017-09-0101 September 2017 Braidwood and Byron, Units 1 and 2 - Figures 151 - 200, Part 1 of 15 RS-17-119, Braidwood and Byron, Units 1 and 2 - Figures 201 - 250, Part 2 of 152017-09-0101 September 2017 Braidwood and Byron, Units 1 and 2 - Figures 201 - 250, Part 2 of 15 RS-17-119, Braidwood and Byron, Units 1 and 2 - Figures 251 - 300, Part 3 of 152017-09-0101 September 2017 Braidwood and Byron, Units 1 and 2 - Figures 251 - 300, Part 3 of 15 RS-17-119, Braidwood and Byron, Units 1 and 2 - Figures 301 - 350, Part 4 of 152017-09-0101 September 2017 Braidwood and Byron, Units 1 and 2 - Figures 301 - 350, Part 4 of 15 RS-17-119, Braidwood and Byron, Units 1 and 2 - Figures 301 - 350, Part 5 of 152017-09-0101 September 2017 Braidwood and Byron, Units 1 and 2 - Figures 301 - 350, Part 5 of 15 RS-17-119, Braidwood and Byron, Units 1 and 2 - Figures 401 - 450, Part 6 of 152017-09-0101 September 2017 Braidwood and Byron, Units 1 and 2 - Figures 401 - 450, Part 6 of 15 RS-17-119, Braidwood and Byron, Units 1 and 2 - Figures 451 - 499, Part 7 of 152017-09-0101 September 2017 Braidwood and Byron, Units 1 and 2 - Figures 451 - 499, Part 7 of 15 RS-17-119, Braidwood and Byron, Units 1 and 2 - Figures 500 - 549, Part 8 of 152017-09-0101 September 2017 Braidwood and Byron, Units 1 and 2 - Figures 500 - 549, Part 8 of 15 ML17255A8502017-09-0101 September 2017 Units 1 and 2 - Figures 650 - 699, Part 11 of 15 ML17255A8522017-09-0101 September 2017 Units 1 and 2 - Figures 750 - 799, Part 13 of 15 ML17255A8542017-09-0101 September 2017 Units 1 and 2 - Figures 850 - 904, Part 15 of 15 ML17255A8532017-09-0101 September 2017 Units 1 and 2 - Figures 800 - 849, Part 14 of 15 ML17255A8592017-09-0101 September 2017 Units 1 and 2 - Figures 251 - 300, Part 3 of 15 ML17255A8662017-09-0101 September 2017 Units 1 and 2 - Figures 500 - 549, Part 8 of 15 ML17255A8652017-09-0101 September 2017 Units 1 and 2 - Figures 451 - 499, Part 7 of 15 ML17255A8612017-09-0101 September 2017 Units 1 and 2 - Figures 301 - 350, Part 4 of 15 RS-17-119, Units 1 and 2 - Figures 550 - 599, Part 9 of 152017-09-0101 September 2017 Units 1 and 2 - Figures 550 - 599, Part 9 of 15 ML17255A8492017-09-0101 September 2017 Units 1 and 2 - Figures 600 - 649, Part 10 of 15 ML17255A8632017-09-0101 September 2017 Units 1 and 2 - Figures 301 - 350, Part 5 of 15 ML17255A8572017-09-0101 September 2017 Units 1 and 2 - Figures 201 - 250, Part 2 of 15 ML17255A8642017-09-0101 September 2017 Units 1 and 2 - Figures 401 - 450, Part 6 of 15 ML17255A8552017-09-0101 September 2017 Units 1 and 2 - Figures 151 - 200, Part 1 of 15 RS-14-338, Byron/Braidwood Nuclear Stations, Updated Final Safety Analysis Report (Ufsar), Revision 15, Chapter 2.0 Figures - Braidwood - Part 2 of 22014-12-15015 December 2014 Byron/Braidwood Nuclear Stations, Updated Final Safety Analysis Report (Ufsar), Revision 15, Chapter 2.0 Figures - Braidwood - Part 2 of 2 ML15055A3902014-12-15015 December 2014 Byron/Braidwood Nuclear Stations, Updated Final Safety Analysis Report (Ufsar), Revision 15, Chapter 2.0 Figures - Braidwood - Part 2 of 2 ML13154A2182013-05-29029 May 2013 License Renewal Boundary Drawings ML0609605122006-03-17017 March 2006 Figure 1 Site Plan and Well Locations Braidwood Station ML0609605042006-03-17017 March 2006 Drawing Showing Braidwood Station, Essex Road, Blowdown Structure at Rive Screen House and 11 Ocw Numbered Items ML0609605022006-03-17017 March 2006 Figure 2.5-25 Geologic Section H-H Braidwood Station Updated Final Safety Analysis Report ML0610204282006-01-31031 January 2006 Drawing Figure 2, Draft Average Groundwater Contours Shallow - January 2006 ML0618400862006-01-30030 January 2006 Figure 5 - Estimated Tritium Results Deep Groundwater Zone - Braidwood Station ML0618400872006-01-30030 January 2006 Figure 4 - Estimated Tritium Results Shallow Groundwater Zone - Braidwood Station ML0610705292006-01-30030 January 2006 Drawing 1, Groundwater Monitoring Locations ML0610705262006-01-30030 January 2006 Drawing 6, Site Specific Hydrogeologic Profile January 2006 (A-A) ML0610106882005-12-16016 December 2005 Tritium Concentrations in the Deeper Monitoring Wells ML0610106762005-12-16016 December 2005 Potential Source Release and Transport Theories ML0610106942005-12-16016 December 2005 Schematic of Regional Hydrogeology ML0618400692005-12-0909 December 2005 E-mail from Habighorst to Lynch, Braidwood Tritium - Recent Contamination Contours, Etc ML0618400592005-12-0808 December 2005 E-mail from Orth to Braidwood Communication Team, Braidwood Tritium - Recent Contamination Contours, Etc ML0609706062005-12-0606 December 2005 Draft - Figure Version 2 Select Locations - Hand Contours December 6, 2005 Braidwood Station ML0609706052005-12-0606 December 2005 Figure Estimated Tritium Concentrations December 6, 2005, Braidwood Station ML0609706032005-12-0606 December 2005 Figure Estimated Tritium Concentration December 6, 2005, Braidwood Station ML0609706022005-12-0606 December 2005 Figure Estimated Tritium Concentrations December 6, 2005, Braidwood Station 2021-05-17 Category:Graphics incl Charts and Tables MONTHYEARBW240069, CFR 50.59 Changes, Tests, and Experiments Summary Report2024-12-13013 December 2024
[Table view]CFR 50.59 Changes, Tests, and Experiments Summary Report ML22031A0442022-01-31031 January 2022 Form OAR-1 Owners Activity Report ML21202A1932021-07-21021 July 2021 Owners Activity Report (OAR) for Refueling Outage A1R22 RS-20-126, EP-AA-111-F-02, Rev. 1, Braidwood PAR Flowchart2020-10-13013 October 2020 EP-AA-111-F-02, Rev. 1, Braidwood PAR Flowchart BW190014, Submittal of Inservice Inspection Summary Report2019-01-30030 January 2019 Submittal of Inservice Inspection Summary Report ML15253A9132015-09-11011 September 2015 ACRS Full Committee - Corrections to the Aging Management Programs Table RS-15-059, Units 1 & 2 - Update to LRA Section 4.3.4, Class 1 Component Fatigue Analyses Supporting GSI-190 Closure, Related to License Renewal Application2015-02-0606 February 2015 Units 1 & 2 - Update to LRA Section 4.3.4, Class 1 Component Fatigue Analyses Supporting GSI-190 Closure, Related to License Renewal Application ML14307B7072014-12-10010 December 2014 Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-T RA-13-075, Response to NRC Request for Information Per 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident- 1.5 Year Response for CEUS Sites2013-09-12012 September 2013 Response to NRC Request for Information Per 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident- 1.5 Year Response for CEUS Sites ML12312A4192012-11-0707 November 2012 NUREG 1307 Public Meeting Revised Table A-4 NEI 08-09, Re-Submittal of the Exelon Cyber Security Plan2010-07-23023 July 2010 Re-Submittal of the Exelon Cyber Security Plan RS-10-105, Parent Guarantee Calculation RS-10-1052010-03-10010 March 2010 Parent Guarantee Calculation RS-10-105 ML0934313182009-12-0101 December 2009 Updated Decommissioning Shortfalls as of December 1, 2009 BW080080, Transmittal of Response to Request for Additional Information Regarding Fall 2007 Steam Generator Inspection2008-08-13013 August 2008 Transmittal of Response to Request for Additional Information Regarding Fall 2007 Steam Generator Inspection ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists ML0707300272007-03-0707 March 2007 Oak Ridge Institute for Science and Education - Letter Report for 18 Water Samples from the Vicinity of the Braidwood Nuclear Generating Station, Braidwood, Illinois (Inspection Report No. 050-00456/2007-003) (Rfta No. 06-001) RS-07-022, Response to Request for Additional Information Regarding Application for Steam Generator Tube Integrity Technical Specification2007-02-15015 February 2007 Response to Request for Additional Information Regarding Application for Steam Generator Tube Integrity Technical Specification ML0621602722006-07-28028 July 2006 Analytical Results for Fourteen Water Samples, Batch Eight, from the Vicinity of the Braidwood Nuclear Generating Station, Braidwood, Illinois (Inspection Report No. 050-00456/2006-004)(RFTA No. 06-001) ML0617103272006-02-0606 February 2006 Tritium Sample Results ML0617102252005-12-19019 December 2005 Orise Letter Dated 12/19/05, W/Personal Notes, Analytical Results for Water Samples Near the Braidwood Nuclear Generation Station in Braidwood, Illinois, Inspection Report 456/457/2005-010 - Rfta No. 06-001 ML0610106942005-12-16016 December 2005 Schematic of Regional Hydrogeology ML0609606442005-11-17017 November 2005 Tritium Sample Results; NRC Split Sample Results ML0522300142005-03-0909 March 2005 RIC 2005 Presentation - F4 - Dale Ambler - Rop/Cross Cutting Issues RS-04-191, Units 1 & 2 - Updated Final Safety Analysis Report (Ufsar), Braidwood Figure 2.1-1 Through 2.5-3192004-12-16016 December 2004 Units 1 & 2 - Updated Final Safety Analysis Report (Ufsar), Braidwood Figure 2.1-1 Through 2.5-319 ML0609605552001-01-31031 January 2001 Of Table 11a (Continued) Teen Inhalation Dose Factors 2024-12-13 |
Text
SOUTHWEST 600-580-SW0-540 520 500 480 460 440 420-400 380-360-0-
-20 40
-,==
--, =--., =::
rc8.3.:R7r 5
- 7 NORTHEAST
-600 a..:., 8 1
580 66
- 540
- 520 500 480
'I>
seri 4N0 440
- 420
- 400 0
S.......................
LEGEND....
IONAL"^W
-.EMBE IAR AYRVRTCL1-
-20
Retrieved from "https://kanterella.com/w/index.php?title=ML061010694&oldid=5366369"