Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML20058P78414 August 1990Part 21 Rept Re Misapplication of Fluorolube FS-5 Oil in Main Steam Line Pressure Gauges.All Four Indicators Replaced W/Spare Gauges Which Utilize High Temp Silicone Oil
ML20125C7167 December 1992Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils EnclStroke time
Anchor Darling
ML20154M16426 April 1988Part 21 Rept Re Design Defect in Automatic Switch Co Tripoint SB12BMR/TL10A22 Pressure Switches.Surveillance Cycle Increased from Monthly to Semimonthly & Mfg to Assist in Determining Cause of Failure
ML20210G99213 August 1985Part 21 Rept Re Failure of Isolated Worm Shaft Gear When Certain Critical Speeds Combined W/Repetitive Transfer of Actuator Clutch Mechanism from Manual (Handwheel) to Motor Drive Mode.Two Possible Solutions Noted
ML20214A13612 May 1987Part 21 Rept Re Capacity of Thermal Compensating Accumulator Being Insufficient to Compensate for Thermal Expansions of Hydraulic Fluid During Full Ambient Temp Transient Required by Customer Specs.Interim & Permanent Mods Identified