Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
DD-93-19, Final Director'S Decision DD-93-19 Under 2.206.Denies Request That NRC Take Immediate EA to Require That Reactor at Plant Remain in Cold Shutdown Until Licensee Could Provide Proof That EDGs at Plant Meet Safety Function14 December 1993Final Director'S Decision DD-93-19 Under 2.206.Denies Request That NRC Take Immediate EA to Require That Reactor at Plant Remain in Cold Shutdown Until Licensee Could Provide Proof That EDGs at Plant Meet Safety FunctionNon-Destructive Examination
DD-93-23, Director'S Decision DD-93-23 Re M Daley & J M Block Requesting Per 10CFR2.206,that NRC Reconsider Civil Penalty Assessed Against Vynp for Operating Station Outside TS from 921015-930406.Request Denied28 December 1993Director'S Decision DD-93-23 Re M Daley & J M Block Requesting Per 10CFR2.206,that NRC Reconsider Civil Penalty Assessed Against Vynp for Operating Station Outside TS from 921015-930406.Request DeniedAnticipated operational occurrence
Enforcement Discretion
Condition Adverse to Quality
Systematic Assessment of Licensee Performance
Fuel cladding
ML20198L17929 December 1997Final Director'S Decision DD-97-26 Pursuant to 10CFR2.206, Granting in Part Petitioners Request in That NRC Evaluated All of Issues Raised in Two Memoranda & Suppl Ltr Provided by Petitioner to See If Enforcement Action WarrantedFire Barrier
ML20217G7158 October 1997Director'S Decision DD-97-25 Re J Block 961206 Petition Requesting Evaluation of 961205 Memo Re Info Presented by Licensee at 960723 Predecisional Enforcement Conference & 961206 Memo Re LERs Submitted at End of 1996.Grants RequestFire Barrier
Enforcement Discretion
ML20235Y94921 July 1987Decision ALAB-869.* ASLB Decision LBP-87-17 Admitting Contention 1 Affirmed,Subj to Substitution of Phrase Design Limits of 150 F & Dismissing Commonwealth of Ma Due to Failure to Submit Admissible Contention.Served on 870722Ultimate heat sink