Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
L-91-009, Forwards Addl Info Re Application for Authorization to Operate Existing Liquid Waste Centrifuge,Relocated as Part of Windsor Nuclear Mfg Facility Revitalization Program,Per 910228 Request5 March 1991Forwards Addl Info Re Application for Authorization to Operate Existing Liquid Waste Centrifuge,Relocated as Part of Windsor Nuclear Mfg Facility Revitalization Program,Per 910228 Request
L-92-055, Forwards Corrected Pages 7-5 & 7-6 of Emergency Plan,Rev 1, Submitted by Ltr Dtd 920903.Change Pages Add Training for Radiological Assessment Survey Team Inadvertently Omitted & for Decontamination Team Which Was Incorrect23 November 1992Forwards Corrected Pages 7-5 & 7-6 of Emergency Plan,Rev 1, Submitted by Ltr Dtd 920903.Change Pages Add Training for Radiological Assessment Survey Team Inadvertently Omitted & for Decontamination Team Which Was Incorrect
L-93-001, Advises That Draft Decommissioning Funding Plan in Final Stages of Internal Review & Expected to Be Submitted in Next Few Wks.Licensee Stated That Funding Plan Would Be Submitted by End of 19924 January 1993Advises That Draft Decommissioning Funding Plan in Final Stages of Internal Review & Expected to Be Submitted in Next Few Wks.Licensee Stated That Funding Plan Would Be Submitted by End of 1992Decommissioning Funding Plan
L-93-004, Discusses Encl Proposed Amend to Windsor Fundamental Nuclear Matl Control Plan.W/O Encl2 February 1993Discusses Encl Proposed Amend to Windsor Fundamental Nuclear Matl Control Plan.W/O Encl
L-93-005, Informs That Windsor Decommissioning Plan Will Be Submitted to NRC by 9303311 February 1993Informs That Windsor Decommissioning Plan Will Be Submitted to NRC by 930331
L-93-032, Requests Changes to Windsor Low Level Radioactive Storage Amend Ltrs & 1223 Re Interim Storage of Low Level Radwaste20 August 1993Requests Changes to Windsor Low Level Radioactive Storage Amend Ltrs & 1223 Re Interim Storage of Low Level Radwaste
L-93-033, Proposes Extension Until 931102 for Response to NRC 930802 RAI Re Decommissioning Funding Plan Submitted on 92070226 August 1993Proposes Extension Until 931102 for Response to NRC 930802 RAI Re Decommissioning Funding Plan Submitted on 920702Decommissioning Funding Plan
L-93-034, Submits 30 Day Rept of 930804 Criticality Alarm Sys Inoperability.Caused by Tripped Circuit Breaker Due to Inadvertent Circuit Overload.Circuits Walked Down & Checked by Electrician3 September 1993Submits 30 Day Rept of 930804 Criticality Alarm Sys Inoperability.Caused by Tripped Circuit Breaker Due to Inadvertent Circuit Overload.Circuits Walked Down & Checked by Electrician
L-93-037, Requests That Extension Until 931008 Be Granted for Responding to NRC Bulletin 91-001,Suppl 1,as Result of Discussions W/M Tokar17 September 1993Requests That Extension Until 931008 Be Granted for Responding to NRC Bulletin 91-001,Suppl 1,as Result of Discussions W/M Tokar
L-93-039, Confirms Termination of Nuclear Fuel Mfg Activities at Facility,Per Commitment Made in30 September 1993Confirms Termination of Nuclear Fuel Mfg Activities at Facility,Per Commitment Made in
L-93-040, Informs That Licensee Believes Response to NRC Bulletin 91-001,Suppl 1,is No Longer Required Due to Windsor Facility No Longer Being Fuel Fabrication Facility7 October 1993Informs That Licensee Believes Response to NRC Bulletin 91-001,Suppl 1,is No Longer Required Due to Windsor Facility No Longer Being Fuel Fabrication Facility
L-93-045, Provides Revised Organization Chart for License SNM-1067 W/Description for Each Key Position to Safety26 October 1993Provides Revised Organization Chart for License SNM-1067 W/Description for Each Key Position to Safety
L-93-052, Provides Request for Addl Info Re Decommissioning Funding Plan Submitted on 92070210 November 1993Provides Request for Addl Info Re Decommissioning Funding Plan Submitted on 920702Decommissioning Funding Plan
L-93-059, Forwards Proprietary Response to Violations Noted in Insp Rept 70-1100/93-201 Re Matl Control & Accounting Program. Encl Withheld Per 10CFR2.79015 December 1993Forwards Proprietary Response to Violations Noted in Insp Rept 70-1100/93-201 Re Matl Control & Accounting Program. Encl Withheld Per 10CFR2.790
L-93-062, Requests Extension on Completion Date for Next Assessment from 940117 to 0315 Re Fundamental Nuclear Matl Control Plan Due to Extraordinary Workloads of Qualified Independent Individuals Intended to Perform Assessment22 December 1993Requests Extension on Completion Date for Next Assessment from 940117 to 0315 Re Fundamental Nuclear Matl Control Plan Due to Extraordinary Workloads of Qualified Independent Individuals Intended to Perform Assessment
L-96-503, Requests That Annual Fees for FY97 for SNM-1067 Be Assessed Per 10CFR171.16-1,Category 1430 September 1996Requests That Annual Fees for FY97 for SNM-1067 Be Assessed Per 10CFR171.16-1,Category 14
L-96-504, Requests Extension to Interim Storage Period by Increasing Time from 5 Yrs to 10 Yrs31 October 1996Requests Extension to Interim Storage Period by Increasing Time from 5 Yrs to 10 Yrs
L-96-505, Responds to NRC Request in Ltr Re Amend Request from Combustion Engineering to Downgrade License SNM-1067,20 December 1996Responds to NRC Request in Ltr Re Amend Request from Combustion Engineering to Downgrade License SNM-1067,
LD-88-014, Forwards Fee for 880120 Application for Amend to License SNM-1067,increasing Weight Percent of Enriched U That Can Be Processed at Facility12 February 1988Forwards Fee for 880120 Application for Amend to License SNM-1067,increasing Weight Percent of Enriched U That Can Be Processed at Facility
LD-88-025, Submits Clarifications to Re Organizational Changes & Appropriate Communication Channels Between Organizations.Organizational Chart & Other Pertinent Info Encl29 March 1988Submits Clarifications to Re Organizational Changes & Appropriate Communication Channels Between Organizations.Organizational Chart & Other Pertinent Info Encl
LD-88-029, Remits Fee for 880427 Application for Renewal of License SNM-106727 April 1988Remits Fee for 880427 Application for Renewal of License SNM-1067
LD-88-036, Forwards Response to Observations & Recommendations of Insp Rept 70-1100/86-04 on 860818-21.Meeting to Provide Clarifications Would Be Welcomed27 May 1988Forwards Response to Observations & Recommendations of Insp Rept 70-1100/86-04 on 860818-21.Meeting to Provide Clarifications Would Be Welcomed
LD-88-054, Remits Fee for 880713 Application for Amend to License SNM-106713 July 1988Remits Fee for 880713 Application for Amend to License SNM-1067
LD-88-061, Provides Overview of Further Anticipated Changes to Facilities,Proposed for Next Two Yrs & Independent of Current Commitments to Upgrade Facilities.Requests Encl Be Withheld Per 10CFR2.79026 July 1988Provides Overview of Further Anticipated Changes to Facilities,Proposed for Next Two Yrs & Independent of Current Commitments to Upgrade Facilities.Requests Encl Be Withheld Per 10CFR2.790
LD-88-064, Forwards Addl Info & Clarifications in Support of 880120 Application for Amend to License SNM-1067 to Increase Weight of Enriched U That Can Be Processed from 4.1 to 5%,per NRC 880125 Meeting Request28 July 1988Forwards Addl Info & Clarifications in Support of 880120 Application for Amend to License SNM-1067 to Increase Weight of Enriched U That Can Be Processed from 4.1 to 5%,per NRC 880125 Meeting Request
LD-88-065, Requests That NRC Grant Condition to License SNM-1067, Authorizing Possession of U-235 Up to 5.0 Weight %,But Not Allowing Processing of Fuel Above 4.1 Weight % & Terminating Condition Upon Approval of Amend Request28 July 1988Requests That NRC Grant Condition to License SNM-1067, Authorizing Possession of U-235 Up to 5.0 Weight %,But Not Allowing Processing of Fuel Above 4.1 Weight % & Terminating Condition Upon Approval of Amend Request
LD-88-070, Provides Addl Info to Supplement Licensee Re Assessment of Facility Radiation Protection Program2 August 1988Provides Addl Info to Supplement Licensee Re Assessment of Facility Radiation Protection Program
LD-88-081, Transmits Addl Info & Clarifications Requested by Bidinger Including,Tabulation of Affected Pages & Rev Numbers & Provides Proposed Change Pages Supporting Amend Request19 August 1988Transmits Addl Info & Clarifications Requested by Bidinger Including,Tabulation of Affected Pages & Rev Numbers & Provides Proposed Change Pages Supporting Amend Request
LD-88-098, Responds to NRC Re Violations Noted in Insp Rept 70-1100/88-07 on 880725-29.Effort Currently Underway to Reconstruct Log Sheets from Other Sources & Steps Being Taken to Prevent Recurrence20 September 1988Responds to NRC Re Violations Noted in Insp Rept 70-1100/88-07 on 880725-29.Effort Currently Underway to Reconstruct Log Sheets from Other Sources & Steps Being Taken to Prevent Recurrence
LD-88-103, Forwards Nuclear Fuel Mfg Facility Independent Task Force Review Status Rept, Per Commitment 5 of29 September 1988Forwards Nuclear Fuel Mfg Facility Independent Task Force Review Status Rept, Per Commitment 5 of
LD-88-105, Forwards Fee for 880923 Request for Extension to 30-day Reporting Requirement for SNM Receipt Insp Measurement Data30 September 1988Forwards Fee for 880923 Request for Extension to 30-day Reporting Requirement for SNM Receipt Insp Measurement Data
LD-88-117, Forwards Presentation Matls from 880927 Meeting on Fuel Facility Revitalization20 October 1988Forwards Presentation Matls from 880927 Meeting on Fuel Facility Revitalization
LD-88-131, Forwards Rev 1 to Part 2 of C-E Nuclear Fuel Integrated Improvement Progam, W/Status of Commitments as of 8810249 November 1988Forwards Rev 1 to Part 2 of C-E Nuclear Fuel Integrated Improvement Progam, W/Status of Commitments as of 881024
LD-88-134, Forwards Pages Inadvertently Omitted from Rev 1 to Part 2 of C-E Nuclear Fuel Integrated Improvement Program,11 November 1988Forwards Pages Inadvertently Omitted from Rev 1 to Part 2 of C-E Nuclear Fuel Integrated Improvement Program,
LD-88-222, Forwards Corrections of Typos & Incorporates Clarifications & Technical Revs Suggested by Into Application for Amend to License SNM-106716 August 1988Forwards Corrections of Typos & Incorporates Clarifications & Technical Revs Suggested by Into Application for Amend to License SNM-1067
LD-89-038, Requests one-time Waiver of Direct Measurement of U-235 Content in Low Level Waste Containers12 April 1989Requests one-time Waiver of Direct Measurement of U-235 Content in Low Level Waste Containers
LD-89-054, Requests Temporary License Condition Allowing Use of Roller Receipt Area.Wording for Temporary License Condition Suggested18 May 1989Requests Temporary License Condition Allowing Use of Roller Receipt Area.Wording for Temporary License Condition Suggested
LD-89-063, Responds to Violations Noted in Insp Rept 70-1100/89-200. Response Withheld (Ref 10CFR2.790(d))9 June 1989Responds to Violations Noted in Insp Rept 70-1100/89-200. Response Withheld (Ref 10CFR2.790(d))
LD-89-066, Forwards Revised 890307 Amend Request Re Windsor Nuclear Fuel Mfg Facility organization.C-E Will Institute Facility Review Group to Assume Oversight Function Re Facility Operations.Tabulation of Affected Pages Also Encl23 June 1989Forwards Revised 890307 Amend Request Re Windsor Nuclear Fuel Mfg Facility organization.C-E Will Institute Facility Review Group to Assume Oversight Function Re Facility Operations.Tabulation of Affected Pages Also Encl
LD-89-083, Responds to NRC Re Violations Noted in Insp Rept 70-1100/89-03.Corrective Action:Evaluation of Bioassay Results Conducted28 July 1989Responds to NRC Re Violations Noted in Insp Rept 70-1100/89-03.Corrective Action:Evaluation of Bioassay Results Conducted
LD-89-087, Responds to NRC Re Violations Noted in Insp Rept 70-1100/89-01.Corrective Action:Procedures Revised to Be Consistent W/Nrc Interpretation of License Requirements2 August 1989Responds to NRC Re Violations Noted in Insp Rept 70-1100/89-01.Corrective Action:Procedures Revised to Be Consistent W/Nrc Interpretation of License Requirements
LD-89-103, Responds to NRC Re Violation Noted in Insp Rept 70-1100/89-04.Corrective Actions:Next Facility Emergency Evacuation Drill Will Include Participation of Offsite Support Agencies to Test Communication Sys & Procedures14 September 1989Responds to NRC Re Violation Noted in Insp Rept 70-1100/89-04.Corrective Actions:Next Facility Emergency Evacuation Drill Will Include Participation of Offsite Support Agencies to Test Communication Sys & Procedures
LD-90-039, Informs of Organizational Changes Affecting Reporting Chain for Selected Individuals Involved in Implementation of Fnmcp.Licensee Has Determined That Changes Do Not Decrease Effectiveness of Plan & as Such,Changes Implemented8 June 1990Informs of Organizational Changes Affecting Reporting Chain for Selected Individuals Involved in Implementation of Fnmcp.Licensee Has Determined That Changes Do Not Decrease Effectiveness of Plan & as Such,Changes Implemented
LD-90-042, Forwards Rev 1 to EPIP 3.01, Fire/Explosion, for Info. Meeting W/Town of Windsor Fire Chief Held on 900612 Re Needs of Fire Dept in Response to Emergency Situations at Facility18 June 1990Forwards Rev 1 to EPIP 3.01, Fire/Explosion, for Info. Meeting W/Town of Windsor Fire Chief Held on 900612 Re Needs of Fire Dept in Response to Emergency Situations at Facility
LD-90-048, Forwards Certification of Financial Assurance for Decommissioning Under License SNM-106719 July 1990Forwards Certification of Financial Assurance for Decommissioning Under License SNM-1067
LD-90-055, Forwards Request for Withdrawal of 900213 Amend Request to License SNM-10678 August 1990Forwards Request for Withdrawal of 900213 Amend Request to License SNM-1067
LD-90-067, Advises That Redeployed Pellet Shop in Windsor Fuel Mfg Facility Needs Reconfiguring to Accommodate New Pellet & Rod Handling Equipment.Necessary Walls,Ceilings & Structural Steel Will Be Erected to Permit Installation13 September 1990Advises That Redeployed Pellet Shop in Windsor Fuel Mfg Facility Needs Reconfiguring to Accommodate New Pellet & Rod Handling Equipment.Necessary Walls,Ceilings & Structural Steel Will Be Erected to Permit Installation
LD-90-068, Advises That Planned Work in Redeployed Pellet Shop of Facility Includes Relocating Centrifuge Sys from Present Location13 September 1990Advises That Planned Work in Redeployed Pellet Shop of Facility Includes Relocating Centrifuge Sys from Present Location
LD-90-088, Forwards Revised Info Re Emergency Plan for License SNM-1067 Per13 November 1990Forwards Revised Info Re Emergency Plan for License SNM-1067 Per
ML20054H9998 June 1982Forwards IE Safeguards Insp Rept 70-1100/82-03 on 820426-30. No Noncompliance Noted