Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateSiteTitle
ML18220A7778 August 2018Clinch RiverSummary from Staff'S Examination of Geologic Features at Tva'S Clinch River Nuclear Site During a 30-31 January 2018 NRC Management Site Visit
ML18220A7858 August 2018Clinch RiverJan 2018 Site Visit-Figures
ML18275A3802 October 2018Clinch RiverOctober 17, 2018 - Draft NRC Staff Slides for ACRS, Section 2.5 SEs with No Open Items (Phase C), Clinch River Nuclear Site Espa
ML18283A11917 October 2018Clinch RiverFinal NRC Staff Slides for ACRS, Section 2.5 SEs with No Open Items (Phase C), Clinch River Nuclear Site Early Site Permit Application
ML20244A26316 September 2020the Reactor and the Volcano a Risk-Informed Approach of the NRC to Assess Volcanic Hazards at New Nuclear Reactor Sites