Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateSiteTitle
IR 05000336/201301016 September 2013MillstoneIR 05000336-13-010, 05000423-13-010; 07/22/2013 - 08/08/2013; Dominion Nuclear Connecticut, Inc.; Millstone Power Station Units 2 and 3; Triennial Fire Protection Baseline Inspection
ML0733802057 June 2007Davis Besse
Perry
E-Mail from Werkeiser to Morgan, Suggested Internal Meeting Date to Discuss FENOC DFI
ML07338020616 July 2007Beaver Valley
Davis Besse
Perry
E-mail from Werkheiser to Bellamy, Firstenergy Nuclear Operating Company'S Supplemental Response to May 14, 2007 DFI
ML17079A16423 March 2017Three Mile IslandNotice of Three Mile Island, Unit 1 Public Meeting to Discuss the NRCs Assessment of Safety Performance at Three Mile Island Nuclear Station, Unit 1 for 2016, as Described in the Annual Assessment Letter Dated March 1, 2017
ML19344D0239 December 2019Nine Mile PointTi 2515/194 Inspection Documentation Request