Semantic search
Jump to navigation
Jump to search
Start date | Status | Title | Topic | |
---|---|---|---|---|
CAC:L53121 | 23 May 2016 | Approved Closed | ||
CAC:MF0435 | 18 December 2015 | Approved Closed | ||
CAC:MF0838 | 24 August 2015 | Approved Closed | ||
CAC:MF3968 | 15 March 2016 | Approved Closed | ||
CAC:MF4131 | 30 November 2015 | Approved Closed | ||
CAC:MF5715 | 1 December 2015 | Approved Closed | ||
CAC:MF5838 | 31 August 2015 | Approved Closed | ||
CAC:MF5868 | 16 February 2016 | Approved Closed | ||
CAC:MF6251 | 8 May 2015 | Approved Closed | ||
CAC:MF6430 | 25 February 2016 | Approved Closed | ||
CAC:MF6700 | 30 June 2015 | Approved Closed | ||
CAC:MF6709 | 4 August 2016 | Approved Closed | ||
CAC:MF7297 | 12 May 2016 | Approved Closed | ||
CAC:MF7561 | 11 February 2016 | Approved Closed | ||
CAC:MF7761 | 25 May 2016 | Approved Closed | ||
CAC:MF8210 | 28 July 2016 | Approved Closed | ||
CAC:MF8468 | 6 October 2016 | Approved Closed | ||
CAC:MF8507 | 5 January 2017 | Approved Closed | ||
CAC:MF8789 | 28 October 2016 | Approved Closed | ||
CAC:MF8935 | 19 December 2016 | Approved Closed | ||
CAC:MF9497 | 14 December 2016 | Approved Closed | ||
CAC:MF9655 | 28 April 2017 | Approved Closed | ||
CAC:MF9844 | 15 June 2017 | Approved Closed | ||
EPID:L-2017-LLA-0316 | 4 October 2017 | Approved Closed | Proposed License Amendment Request to Revise Integrated Leak Rate Test (Type a) and Type C Test Intervals | |
EPID:L-2018-LLA-0099 | 4 April 2018 | Approved Closed | License Amendment Request to Revise Technical Specification Action Statement for Loss of Control Building Inlet Ventilation Radiation Monitor Instrumentation Channels | |
EPID:L-2018-LLA-0126 | 3 May 2018 | Approved Closed | License Amendment Request Regarding Proposed Technical Specifications Changes for Spent Fuel Storage and New Fuel Storage | |
EPID:L-2019-LLA-0003 | 5 February 2019 | Approved Closed | Independent Spent Fuel Storage Installation (Isfsi); North Anna, Units 1 and 2 and ISFSI; and Surry, Units 1 and 2 and ISFSI - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Rev. 6. | |
EPID:L-2019-LLA-0008 | 27 February 2019 | Approved Closed | 12/17/2019 E-mail from S. Sinha to R. Guzman - Proposed License Conditions for License Amendment Request 10 CFR 50.69 | |
EPID:L-2019-LLA-0164 | 6 September 2019 | Approved Closed | ||
EPID:L-2019-LLA-0165 | 6 September 2019 | Approved Closed | ||
EPID:L-2019-LLA-0177 | 17 January 2019 | Approved Closed | TSTF-425, TSTF-425 | |
EPID:L-2019-LLA-0186 | Approved Closed | TSTF-569 | ||
EPID:L-2019-LLA-0288 | 17 December 2019 | Approved Closed | License Amendment Request to Revise TS 6.25, Pre-Stressed Concrete Containment Tendon Surveillance Program | |
EPID:L-2019-LRO-0106 | 16 December 2020 | Approved Closed | ||
EPID:L-2020-LLA-0027 | 19 February 2020 | Approved Closed | TSTF-510 TSTF-577, TSTF-425 TSTF-52 | |
EPID:L-2020-LLA-0039 | 3 March 2020 | Approved Closed | License Amendment Request to Revise Technical Specification Table 3.3-11, Accident Monitoring Instrumentation | |
EPID:L-2020-LLA-0094 | 8 April 2020 | Approved Closed | Notice of Category 3 Public Meeting - Annual Assessment Meeting for Millstone Power Station | |
EPID:L-2020-LLA-0178 | 11 August 2020 | Approved Closed | Connecticut. Inc. Millstone Power Station Unit 3, Proposed License Amendment Request for a One-Time Extension of the Millstone Unit 3 Steam Generator Inspections | |
EPID:L-2020-LLA-0227 | 24 February 2020 | Approved Closed | TSTF-510 TSTF-577, TSTF-510 TSTF-577 | |
EPID:L-2020-LLA-0242 | 28 February 2020 | Approved Closed | Proposed License Amendment Request, Addition of Analytical Methodology to the Core Opera Ting Limits Report for a Full Spectrum Loss of Coolant Accident (Fsloca) Gamma Energy Redistribution Information | |
EPID:L-2020-LLA-0266 | 11 January 2021 | Approved Closed | ||
EPID:L-2020-LLE-0145 | 24 November 2020 | Approved Closed | ||
EPID:L-2020-LLE-0227 | 16 December 2020 | Approved Closed | ||
EPID:L-2020-LLR-0024 | 11 February 2020 | Approved Closed | ASME Section XI Inservice Inspection Program: Relief Request for Limited Coverage Examinations Performed in the Second Period of the Fourth 10-Year Inspection Interval | |
EPID:L-2020-LLR-0028 | 17 February 2020 | Approved Closed | ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the Second Period of the Third 10-Year Inspection Interval | |
EPID:L-2020-LLR-0038 | 14 March 2020 | Approved Closed | Alternative Request IR-4-03 for Use of an Alternative Non-Code Methodology to Demonstrate Structural Integrity of Class 3 Moderate-Energy Piping | |
EPID:L-2020-LLR-0081 | 16 July 2020 | Approved Closed | ||
EPID:L-2020-LLR-0097 | 15 July 2020 | Approved Closed | Alternate Request RR-05-06 - Inspection Interval Extension for Steam Generator Pressure Retaining Welds and Full-Penetration Welded Nozzles | |
EPID:L-2020-LLR-0130 | 23 September 2020 | Approved Closed | ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the Third Period of the Fourth 10-Year Inspection Interval | |
EPID:L-2020-LLR-0158 | 17 December 2020 | Approved Closed | Proposed Alternative Requests RR-05-04 and IR-4-02, Use of Alternative Pressure/Flow Testing Requirements for Service Water System Supply Piping |