Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
ML13098B0715 April 2013Beltz T
Plant Licensing Branch III
NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance Review Relief Request RR-4L3Acceptance Review
ML13184A0971 July 2013Beltz T
Plant Licensing Branch III
NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Draft Requests for Additional Information Regarding Relief Request RR-4L3Draft RAI
ML13329A04220 December 2013Robert Carlson
Plant Licensing Branch III
Relief from the Requirements of ASME Code, Section XI, for the Fourth 10-Year Inservice Inspection Interval (RR-4L3)Approval
NRC 2013-0073, 10 CFR 50.55a Request. Relief Request RR-4L3 Lnservice Inspection Impracticality Examination Limitations Due to Configuration Fourth Ten-Year Lnservice Inspection Program Interval Response to Request for Additional Information28 August 2013Point Beach
Meyer L
10 CFR 50.55a Request. Relief Request RR-4L3 Lnservice Inspection Impracticality Examination Limitations Due to Configuration Fourth Ten-Year Lnservice Inspection Program Interval Response to Request for Additional InformationResponse to RAI