Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
L-11-331, License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating.11 October 2011FirstEnergy
Bezilla M
License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating.Request
L-11-333, Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12, 201113 October 2011FirstEnergy
Bezilla M
Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12, 2011Supplement
L-11-335, Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12. 201116 October 2011FirstEnergy
Bezilla M
Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12. 2011Supplement
L-11-338, Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12, 201117 October 2011FirstEnergy
Bezilla M
Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12, 2011Supplement
ML11286024517 October 2011Michael Mahoney
Plant Licensing Branch III
Issuance of Amendment No. 160, Revise Technical Specification 3.8.1, AC Sources - Operating, Regarding Use of a Delayed Circuit as a Required Offsite Circuit (Emergency Circumstances)Approval