Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
CP-201001545, Relief Request No. B-10 for the Unit 1 Second 10 Years ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000)15 December 2010Luminant
Flores R
Relief Request No. B-10 for the Unit 1 Second 10 Years ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000)Request
CP-201001546, Relief Request No. B-11 for the Second 10 Years ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000)15 December 2010Luminant
Madden F
Relief Request No. B-11 for the Second 10 Years ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000)Request
CP-201100772, Response to Request for Additional Information, Relief Requests Nos. B-10 and B-1115 June 2011Luminant
Flores R
Response to Request for Additional Information, Relief Requests Nos. B-10 and B-11Response to RAI
ML11018043918 January 2011Balwant Singal
Plant Licensing Branch IV
E-mail Comanche Peak, Unit 1 - Acceptance Review Email for Relief Request (RR) B-11 for Piping Welds and RR B-10 for Safety Injection Piping (TAC Me, Second 10-Year Inservice Inspection IntervalAcceptance Review
ML11136088516 May 2011Balwant Singal
Plant Licensing Branch IV
Email, Request for Additional Information Relief Request (RR) B-11 for Piping Welds and RR B-10 for Safety Injection Piping, Second 10-Year Inservice Inspection IntervalRAI
ML11136099816 May 2011Balwant Singal
Plant Licensing Branch IV
Request for Additional Information, Relief Request (RR) B-11 for Piping Welds and RR B-10 for Safety Injection Piping, Second 10-Year Inservice Inspection IntervalRAI
ML11265008310 November 2011Markley M
Plant Licensing Branch IV
Approval of Relief Request Nos. B-10 and B-11 for the Second 10-Year Inservice Inspection IntervalOther