Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
LIC-95-0007, Responds to NRC RAI to Assist Closure of NRR Staff Review of Plant Revised Evaluation of CR Habitability.W/One Oversize Encl17 January 1995OMAHA PUBLIC POWER DISTRICT
Tira Patterson
Responds to NRC RAI to Assist Closure of NRR Staff Review of Plant Revised Evaluation of CR Habitability.W/One Oversize EnclOther
LIC-95-0079, Responds to Questions in NRC 950302 RAI & Addl Questions Raised by NRC During 950323 Telcon,To Assist Closure of NRR Review of Plant Revised Evaluation of Control Habitability5 April 1995OMAHA PUBLIC POWER DISTRICT
Tira Patterson
Responds to Questions in NRC 950302 RAI & Addl Questions Raised by NRC During 950323 Telcon,To Assist Closure of NRR Review of Plant Revised Evaluation of Control HabitabilityOther
ML20198Q38028 October 1997Wharton L
NRC (Affiliation Not Assigned)
Forwards SE Re Control Room Habitability Evaluation Submitted by Ltrs Dtd 940819,950117 & 0405Approval