Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
IR 05000346/198701715 January 1988NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Phillips M
Wohld P
Safety Insp Rept 50-346/87-17 on 870624-26 & 1211-17.No Violations or Deviations Noted.Major Areas Inspected: Activities Re IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due To..Request
ML20137Q98613 November 1985Stolz J
Office of Nuclear Reactor Regulation
Advises That Util 851018 Request to Use Alternative Insp Method for Inservice Pressure Tests, Instrumented Insp Technique, ApprovedOther
ML20138F90518 October 1985FirstEnergy
Williams J
Requests Approval to Use Alternative Insp Technique to Satisfy Inservice Pressure Testing Requirements of ASME Code,Section Xi,Per 10CFR50.55a(a)(3).Details of Technique Explained in H.A.F.A Intl,Inc Rept Hafa 135(P)(A)Other
ML20151G61211 April 1988FirstEnergy
Shelton D
Notifies of Plans to Use Instrumented Insp Techniques for Applications Listed,Including Implementation Over Next 10 Yrs for Inservice Insp Pressure Test Program & Taking Credit for Inservice Valve TestingOther
ML20155B39829 September 1988FirstEnergy
Shelton D
Advises That Util Will Approve Instrumented Insp Technique Test Procedures Utilizing Qualified Reviewer Process Required by Tech Specs Rather than Safety Review Board Review & Approval,Consistent W/Amend 10 to License NPF-3Other
ML20155E14728 September 1988Office of Nuclear Reactor Regulation
De Agazio A
Advises That Info Contained in 880411 & 0908 Ltrs Re Use of Instrumented Insp Technique (IIT) Represents Acceptable Alternative Testing Method as Discussed in Topical Rept on IIT Evaluated & Approved byOther