Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
BECO-85-186, Requests Change to Previous Commitment to Complete Breakwater Survey Following Major Storm.Complete Survey Unnecessary Expense Unless Initial Walkdown Indicates Need. Annual Breakwater Survey Will Continue to Be Performed16 October 1985Harrington W
Eversource Energy
Requests Change to Previous Commitment to Complete Breakwater Survey Following Major Storm.Complete Survey Unnecessary Expense Unless Initial Walkdown Indicates Need. Annual Breakwater Survey Will Continue to Be PerformedOther
ML20140E48125 March 1986Zwolinski J
Office of Nuclear Reactor Regulation
Discusses 851016 Proposed Change to Commitment to Perform Complete Survey,Including Photography of Main Breakwater Following Major Storm.Annual Survey to Detect Settlement or Horizontal Displacement SuggestedOther