Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
IR 05000285/198502329 November 1985NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Hunnicutt D
Boardman J
Insp Rept 50-285/85-23 on 851021-25.No Violations or Deviations Noted.Major Areas Inspected:Qa,Procurement & Matl Receipt Handling & Storage Programs,Storage Control & Plant Review CommitteeRequest
ML20133G6404 October 1985OMAHA PUBLIC POWER DISTRICT
Andrews R
Forwards Proposed Schedule for Validation Completion & Use of Cecor Re Core Reload Methodology on ERF Computer.Nrc to Be Notified When Validation of mini-CECOR/BASSS Sys CompleteOther
ML20141N97410 March 1986Thadani A
Office of Nuclear Reactor Regulation
Authorizes Utilization of mini-CECOR/BASSS Sys,Per 851129 Amend 92 to License DPR-40,which Changed Tech Specs to Support Operation at Full Rated Power During Cycle 10.Open Item Considered ClosedOther
ML20153F00918 February 1986OMAHA PUBLIC POWER DISTRICT
Andrews R
Requests Approval to Use MINI-CECOR/BASSS for in-core Monitoring of Limiting Conditions for Operation on Peak Linear Heat Rate & Departure from Nucleate BoilingOther