Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
IR 05000346/198601112 March 1986NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Norton J
Muffett J
Insp Rept 50-346/86-11 on 860227-28.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on IE Bulletin 80-11, Masonry Wall DesignsRequest
ML20138A83612 March 1986FirstEnergy
Williams J
Forwards Test Repts of Fisher & Porter 50 Ek 1,000 Converter & Bailey 880 Sys Isolation Devices,Confirming Potential for SPDS Isolation from Electrical & Electronic Interference W/Equipment & Sensors Used in Safety Sys,Pr 840726 RequestOther
ML20207C80723 December 1986FirstEnergy
Williams J
Forwards Outline & Results of First Fault Isolation Test for Fischer & Porter 50EK1000 I/I Converter Which Verified Fault Current Did Not Affect Input Circuit,Per 861211 Telcon.Ltr Transmitted Second Test ResultsOther
ML20212A82717 February 1987Stolz J
Office of Nuclear Reactor Regulation
Requests Addl Info in Order to Continue Review of SPDS, Including Block Diagram of SPDS That Contains & Identifies Class 1E-to-non-Class 1E Interfaces & Schematic Diagram for Each Type of Isolation Device.Info Requested by 870310Approval
ML20212D1473 October 1986FirstEnergy
Long J
Daft C
Elfstrom R
Rev 1 to Maint Procedure MP 1411.05, Maint & Repair of Limitorque Valve Operators Types SMB-0 Through SMB-4Request
ML20215F4446 October 1986FirstEnergy
Williams J
Forwards Summary of Test on Isolation Device & Results Verifying That Test Fault Did Not Affect Input Circuit,Per Request.Isolation Device Continued to Perform FunctionOther