Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
05000366/LER-1950-366, Informs of Mod to Previous Commitment Re Operation of Facility Beyond CY83 W/O Completing Corrective Action on Pipe Whip Issue Described in LER 50-366/283-46.Facility Will Continue to Operate Into Jan 198422 December 1983Southern Nuclear
Gucwa L
Informs of Mod to Previous Commitment Re Operation of Facility Beyond CY83 W/O Completing Corrective Action on Pipe Whip Issue Described in LER 50-366/283-46.Facility Will Continue to Operate Into Jan 1984Other
ML20079E52822 December 1983Southern Nuclear
Gucwa L
RO 50-366/83-46:on 830623,certain Pipe Whip Restraints Reported Not Installed.Commitment Made at 830928 Meeting Not to Operate Beyond End of CY83 W/O Completion of Corrective Action Extended Into Jan 1984Meeting
NRC Generic Letter 1983-276 July 1983Eisenhut D
Office of Nuclear Reactor Regulation
NRC Generic Letter 1983-027: Surveillance Intervals in Standard Technical SpecificationsRequest