Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
ML23115A2121 May 2023Klos L
Plant Licensing Branch II
Review of the Spring 2022 Steam Generator Tube Inspection ReportApproval
PMNS20221085, Pre-submittal Meeting with Duke Energy Carolinas, LLC (Duke Energy, the Licensee) to Discuss Proposed License Amendments to Adopt TSTF-505 and 10 CFR 50.69 at McGuire Nuclear Station, Units 1 and 2 (McGuire)25 October 2022Office of Nuclear Reactor RegulationPre-submittal Meeting with Duke Energy Carolinas, LLC (Duke Energy, the Licensee) to Discuss Proposed License Amendments to Adopt TSTF-505 and 10 CFR 50.69 at McGuire Nuclear Station, Units 1 and 2 (McGuire)Meeting
RA-22-0101, End of Cycle 27 (M2R27) Steam Generator Tube Inspection Report24 March 2022Duke Energy
Pigott E
End of Cycle 27 (M2R27) Steam Generator Tube Inspection ReportRequest
RA-22-0303, End of Cycle 28 (M1 R28) Steam Generator Tube Inspection Report25 October 2022Duke Energy
Pigott E
End of Cycle 28 (M1 R28) Steam Generator Tube Inspection ReportRequest
RA-23-0025, End of Cycle 28 (M1R28) Steam Generator Tube Inspection Report Response to Request for Additional Information (RAI)15 February 2023Duke Energy
Pigott E
End of Cycle 28 (M1R28) Steam Generator Tube Inspection Report Response to Request for Additional Information (RAI)Response to RAI
RA-23-0076, Supplement to Response to Request for Additional Information (RAI) Regarding McGuire Nuclear Station Unit 1 Spring, 2022 Outage Steam Generator Tube Inspection Report16 March 2023Duke Energy
Pigott E
Supplement to Response to Request for Additional Information (RAI) Regarding McGuire Nuclear Station Unit 1 Spring, 2022 Outage Steam Generator Tube Inspection ReportSupplement