Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
DCL-20-039, One Hundred Eighty Day Steam Generator Report for Diablo Canyon Power Plant Unit 2 Twenty-First Refueling Outage13 May 2020Pacific Gas & Electric
Gerfen P
One Hundred Eighty Day Steam Generator Report for Diablo Canyon Power Plant Unit 2 Twenty-First Refueling OutageRequest
DCL-20-088, Response to NRC Request for Additional Information Regarding Diablo Canyon Unit 2 Fall 2019 Steam Generator Tube Inspection Report16 October 2020Pacific Gas & Electric
Gerfen P
Response to NRC Request for Additional Information Regarding Diablo Canyon Unit 2 Fall 2019 Steam Generator Tube Inspection ReportResponse to RAI
ML20261H42317 September 2020Samson Lee
NRC/NRR/DORL/LPL4
NRR E-mail Capture - Request for Additional Information: Diablo Canyon Unit 2 Fall 2019 Steam Generator Tube Inspection ReportRAI
ML20338A2928 December 2020Samson Lee
Plant Licensing Branch IV
Review of the Fall 2019 Steam Generator Tube Inservice Inspection ReportApproval