Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
CNL-20-014, Application to Modify the Technical Specification to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09)23 September 2020Tennessee Valley Authority
James Barstow
Application to Modify the Technical Specification to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09)Request
CNL-21-039, Response to Request for Additional Information Re Application to Modify Technical Specification to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09)5 May 2021Tennessee Valley Authority
Polickoski J
Response to Request for Additional Information Re Application to Modify Technical Specification to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09)Response to RAI
CNL-21-066, Correction to Application to Modify the Technical Specifications to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09) (EPID L-2020-LLA-0216, EPID L-2020-LLA-016913 August 2021Tennessee Valley Authority
Polickoski J
Correction to Application to Modify the Technical Specifications to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09) (EPID L-2020-LLA-0216, EPID L-2020-LLA-0169Request
ML20303A07729 October 2020Michael Wentzel
NRC/NRR/DORL/LPL2-2
NRR E-mail Capture - Sequoyah Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment Request Regarding Request to Transition to Westinghouse RFA-2 FuelAcceptance Review
ML20304A18710 November 2020Michael Wentzel
Plant Licensing Branch II
Request for Withholding Information from Public DisclosureWithholding Request Acceptance
ML21035A3224 February 2021Michael Wentzel
NRC/NRR/DORL/LPL2-2
NRR E-mail Capture - Sequoyah Nuclear Plant, Units 1 and 2 - Audit Plan and Setup of Online Reference PortalOther
ML21036A1094 February 2021Michael Wentzel
NRC/NRR/DORL/LPL2-2
NRR E-mail Capture - Sequoyah Nuclear Plant, Units 1 and 2 - Corrected Audit Plan and Setup of Online Reference PortalOther
ML21090A2288 April 2021Michael Wentzel
Plant Licensing Branch II
Regulatory Audit Summary Related to Request to Transition to Westinghouse FuelOther
ML21095A0485 April 2021Michael Wentzel
NRC/NRR/DORL/LPL2-2
NRR E-mail Capture - Sequoyah Nuclear Plant, Units 1 and 2 - Request for Additional Information Regarding Request to Transition to Westinghouse FuelRAI
ML21245A26727 October 2021Perry Buckberg
Plant Licensing Branch II
NON-PROPRIETARY - Sequoyah Nuclear Plant, Units 1 and 2 - Issuance of Amendment Nos. 356 and 349 Regarding the Transition to Westinghouse Robust Fuel Assembly-2 (RFA-2) FuelApproval