Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
ML18179A22715 June 2018Vogtle Electric Generating Plant Units 3 and 4 - Updated Final Safety Analysis Report, Tier 1, Technical Requirements Manual and Technical Specifications Bases Annual SubmittalRequest
ML19035A75522 February 2019Issuance of Amendments 154/153 and Granting of Exemptions Administrative Changes to Align Initial Test Program with Regulatory Guide 1.68 (LAR-18-024)Request
ML19035A75622 February 2019Gleaves W
NRC/NRO/DLSE/LB2
(LAR-18-024) Cover Letter - Administrative Changes to Align Initial Test Program with Regulatory Guide 1.68. Amendment 154/153Other
ML19035A75722 February 2019Jennifer Dixon-Herrity
NRC/NRO/DLSE/LB2
Amendment 154 LAR-18-024Other
ML19035A75822 February 2019NRC/NRO/DLSE/LB2Attachment for Amendment 154 - LAR-18-024Acceptance Review
ML19035A75922 February 2019Jennifer Dixon-Herrity
NRC/NRO/DLSE/LB2
Amendment 153 LAR-18-024Other
ML19035A76022 February 2019NRC/NRO/DLSE/LB2Attachment for Amendment 153 - LAR-18-024Acceptance Review
ML19035A76122 February 2019Anna Bradford
NRC/NRO/DLSE/LB2
Exemption - LAR-18-024Other
ML19035A76222 February 2019Anna Bradford
NRC/NRO/DLSE/LB2
Exemption - LAR-18-024Other
ML19035A76322 February 2019Bill Gleaves
NRC/NRO/DLSE/LB2
(LAR-18-024) Safety Evaluation - Administrative Changes to Align Initial Test Program with Regulatory Guide 1.68. Amendments 154/153Approval
ND-18-1120, Request for License Amendment and Exemption: Administrative Changes to Align Initial Test Program (ITP) with Regulatory Guide 1.68 (LAR-18-024)30 August 2018Southern Nuclear
Yox M
Request for License Amendment and Exemption: Administrative Changes to Align Initial Test Program (ITP) with Regulatory Guide 1.68 (LAR-18-024)Request